Laserfiche WebLink
.Y�,y' <br /> . i i� <br /> � <br /> Painter's Creek Development �' <br /> - December 9, 1983 <br /> that are mislocated in an area different f m that as staked in the field <br /> could have substantially different results han designed. It is recommended <br /> the stakes in the field be surveyed in orde to relocate the drainfield <br /> areas as tested. <br /> The topsoil (A-horizon) strata was fou d to have a faster percolation <br /> rate than the underlying soils. In this re ard, it is suggested to maintain <br /> as much of the topsoil as possible in the d ainfield area and to limit the <br /> depth of the trenches where the topsoil thi kness is thin. <br /> If I can be of further assistance to y u, please contact me. <br /> Sincerel , <br /> / � � // <br /> ` � � � <br /> Michael 'Donnell, P.E. <br /> Consulti g Engineer <br /> ccn <br /> Enclosures <br /> iil <br />