My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design - 1999
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4375 Bayside Road - 06-117-23-12-0009 - New PID
>
4375 Bayside Rd - PID: 06-117-23-12-0008 - Old PID
>
Land Use
>
Septic design - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:23:15 PM
Creation date
9/2/2015 2:36:38 PM
Metadata
Fields
Template:
x Address Old
House Number
4375
Street Name
Bayside
Street Type
Road
Address
4375 Bayside Rd
Document Type
Land Use
PIN
0611723120009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, . • � � • <br /> � . <br /> � . •y y C N <br /> , 9 <br /> PUMP SELECTION PROCEDLIRE I <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minunum suggested is 20 gpm <br /> 2. I�.1dXimum SuggeSted i5 45 gPrr��� Perforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution (feet) (inches <br /> 3. a. Select number of perforated laterals 7/3z 1/4 <br /> b. Select perforation spacing= feet. 1.oa o..�6 o.7a <br /> c. Subtract 2 ft. from the rock layer length. t.5 0.69 0.90 <br /> Rock Iryer IengN <br /> -2 ft. = feet. �.- 2.ob 0.80 1.04 <br /> d. Determine the number of spaces between perforations. a Use t.o foot single homes. <br /> Length perf.spacing= ft.= ft. - spaces b Use 2.0 feet for anything else. <br /> e. spaces+1 = perforations/lateral <br /> f. Multiply perforations;per lateral by number;qf laterals to <br /> get total number of perforations. A�a�s x �,T�= p rforations. <br /> g• � X �m,��- gPm• . <br /> i <br /> "= SELECTED PUMP CAPACITY��pm <br /> , � <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharg . <br /> '�'�d feet <br /> 2. If pumping to a pressure distribution system,five feet for ressure SoJ Ceatment systvn <br /> required at manifold if gravity system,zero. °:°�"`-"°: �/ O <br /> �_feet Total p�pe I�q�t, <br /> 3. Fricrion loss <br /> -� a. Enter friction loss table with gpm and pipe diameter. i,,,e � gJevanon Dlffernnce <br /> Read friction loss in feet per 100 feet from table(F-14). P'�` <br /> � ------ -- - <br /> F.L. _ �� � ft./100 ft of pipe -�f � <br /> b. Determine total pipe length from pump to discharge --'�°""--�---�� �-- �- �� �� <br /> point. Estimate by adding 25 percent to pipe length fo fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length- 1.25 times pi�e length= I <br /> l�o x 1.25=��feet Friction Loss in Plastic Pipe <br /> c. C a lcu la te to t a l f r i c ti o n l o s s b y m u l ti p l y i n g <br /> friction loss in ft/100 ft by equivalent pipe length.l �,. Nominal <br /> pipe dia. <br /> Total friction loss= 3��_x l t� 3 =100= � � feet <br /> 4. Total head required is the sum of elevation differenc�, ���te 1.5" 2" 3" <br /> special head requirements,and total friction loss. <br /> �� + '� � ` 20 2.47 0.73 0.11 <br /> + � 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 523 1.55 0.23 <br /> � 35 6.96 2.06 0.30 <br /> TOTAL HEAD � 40 8.91 2.64 0.39 <br /> Z feet 11.07 0.48 <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection bo 5.60 o.s2 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> ��z 1. A pump must be selected�to deliver at le st <br /> gpm (Step A) with at least �zfeet of total ead (Step B). <br /> ; <br /> ; <br /> � <br /> ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.