Laserfiche WebLink
� <br /> Willie Gibbs <br /> From: Willie Anderson [willie@crowmm�.com <br /> Sent: Thursday, August21, 2008 1:26 PM <br /> To: Willie Gibbs <br /> Subject: FW: rezabek <br /> Willie, ,��8 <br /> Below is the engineers response to the need for j ist hangers at t e Bayside Road project. <br /> Thank you, <br /> Willie Anderson <br /> The Crown Construction Company, Inc. <br /> willie@crowmm�.com . <br /> 612-868-1899 <br /> fax - 763-521-4123 <br /> -----Original Message----- <br /> From: rvjohn@umn.edu [mailto:rvjohn@umn.edu] <br /> Sent: Saturday, August 09, 2008 1:26 PM <br /> To: Willie Anderson <br /> ubject: Re: rezabe� <br /> Willie: <br /> You will have �o re`resh my memory. I remember we were planning to install double member 2 <br /> x 6 collar ties bolted to the rafters at the 9' 1 vel and spaced at 6'-4" o.c. <br /> In that case you would not need joist hangers. <br /> Rollie Johnson, P.E. <br /> I <br /> On Aug 9 2008, Willie Anderson wrote: <br /> >Rollie, <br /> >The Orono inspector wants me to install either a ledger or joist <br /> >hangers at the rafter to ridge board at the Reza ek screen porch. <br /> >We have collar ties so this ridge is not structu al. <br /> > <br /> >Please confirm that I will not need hangers or a ledger at this connection. <br /> > <br /> >Willie Anderson <br /> >The Crown Construction Company, Inc. <br /> >willie@crowmm�.com <br /> >612-868-1899 <br /> >fax - 763-521-4123 i <br /> � I <br /> > � <br /> > <br /> No virus found in this incoming message. II <br /> Checked by AVG - http: //www.avg.com <br /> Version: 8.0. 138 / Virus Database: 270. 6.0/1601 - IRelease Date: 8/8/2008 9: 02 AM <br /> 1 <br />