My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development contract
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Land Use
>
Development contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:28 PM
Creation date
9/1/2015 12:37:36 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Land Use
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elevations of the following: a) cross sections of pon s; b) location and elevations along all <br /> swales, wetlands, wetland mitigation areas if any, an ditches, locations and dimensions of <br /> borrow areas/stockpiles, and installed "conservation are " posts; and c) lot corner elevations, and <br /> house pads. The City will withhold issuance of build ng permits until the approved certified <br /> grading plan is on file with the City and all erosion contr 1 measures are in place as determined by <br /> the City Engineer. The Developer certifies to the City t at all lots with house footings placed on <br /> fill will have been monitored and constructed to meet r exceed FHA/HUD 79G specifications. <br /> The Developer agrees to stake, for demonstration p oses only, the proposed areas to be <br /> dedicated to the City for possible use as parks. <br /> 16. CLEAN UP. The Developer shall cle dirt and debris from streets that has <br /> resulted from construction work by the Developer, uilders, subcontractars, their agents or <br /> assigns. Prior to any construction on the Land, th Developer shall identify in writing a <br /> responsible party and schedule for erosion control, street leaning, and street sweeping. <br /> 17. CONSTRUCTION AND MAINT NANCE OF IMPROVEMENTS. <br /> Developer shall enter into and execute a Private Road asement and Maintenance Declaration. <br /> Upon completion of the Improvements, the City sha 1 inspect the Irnprovements and notify <br /> Developer if any of the Improvements do not conform to the requirements of this Contract. <br /> 18. CITY ENGINEERING ADMINIS RATION AND CONSTRUCTION <br /> OBSERVATION. The Developer shall pay a fe for engineering administration. City <br /> engineering administration will include monitoring of c nstruction observation, consultation with <br /> Developer and its engineer on status or problems reg ding the project, coordination for final <br /> inspection and acceptance, project monitoring during the warranty period, and processing of <br /> requests for reduction in the "security." Fees for this ervice shall be at standard hourly rates. <br /> 7 <br /> 169371v� <br />
The URL can be used to link to this page
Your browser does not support the video tag.