My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•3. ABSORPTION AREA SIZING <br /> Note:Mound setbocks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1 F)=Absorption Width <br /> 10.0 ft X 2. = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhitl from the upslo edge of the Bed. <br /> Calculate Downs[ope Absorption Width:Absorption Width (3.A)-Bed Wid (2.6)=ft <br /> 20.0 ft - 10, ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate C(eon Sand Lift: 3 feet minus Depth to Limiting Condition (t.C) Cleon Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sa d Lift(optional): ��2� <br /> B. Calculate Ups(ope Height:C(ean Sand Lift (4.A)+media depth (1 ft.)+co er (1 ft.)=Upslope Helght <br /> 2.0 ft + 1.0 ft + 1.0 ft= 4. ft <br /> D�l;:Slcp>�!u'r.i;,�'er'at;c <br /> i landSlop2 3 0 1 � 2 3 4 5 b 7 8 9 10 t1 It� i3 E IA IS I6 i7 18 14 20 21 22 23 24 15 ' <br /> �lp�li�G;� ;I ?.� ?.4f'�3i �'S "t.56 t.�i 2.5- i.�t3 2.at �5 L,ijt2� 2.itii.'?`i.!71�.0`' ':.tu LO> LG: 1.S? 1.Si i.i's 1.9+. I.°9�t.8' I.Ei <br /> � E�m1R�[��i ��:t 4.tXf i.BS�i?0 3.5' 3.d5 3.31 3.23 3.i2 3.43 2.9d�2.8K.Z.18 2.70 2.b2 [.55 "1,a8 2.d! 2.'-9 2.24 ?.2i 2.18 L13 2.6�8 2,Oi i.�d 1.53 <br /> LandSlope°s o 1 2 's 4 5 6 1 8 4 16 II 11 13 1�4 15 ib il 18 t9 t�l 21 22 23 24 15 <br /> � ��G';�f1i10�?� li:l 3-a; t.�;i i.?i i,i8 3.�t1 3.5)�i.45 i.Nt 3.i5 a.11 4.t9 :.18 d.59 ,.95ii.�.lj5.i5 �&E E.2a 6.S ].N 7.a% l.�ii �.�"[ ?.9; 4..1� i0.�1 <br /> ; 6.wit�Ri;'r.. i�1:1 �.00 �!7 a.3s a.0�t,76 S.�fi 5.25 5.55 5.88 6,25 6.67 7.fa 1.69 8.2i 8.41 v.57 1Q.i4 10.9� 1i.57 iZ.�2 !3.i9 '3.49 !.�.82 t5.67 '6.5: 11.�: <br /> Select Upslope 8erm Mu(tip(ier <br /> �' (based on land slope): 2.48 (figure D-34) <br /> D. Calcutate Upslope Berm Width:Multip(ier (4.C)X Ups(ope Mound Heiqht 4.6)=Ups(ope Berm Width <br /> 2.48 ft X 4. ft = 10.0 ft <br /> E. Calcutate Drop in Elevation Under Bed:Bed Width (2.6) X Land Slope (1.D =100=Drop (ft) <br /> 10.0 ft X 7. % = 100= 0.70 ft <br /> F. Calculate Downslope Mound Height:Ups(ope Height (4.6)+Drop in Elevati n (4.E)=Downs(ope Height <br /> 4.0 ft + 0.7 ft = 4.7 ft <br /> G Select Downsfope Berm Mu(tip(ier <br /> (based on land stope): 5.32 (figure D-34) <br /> H. Calcutate Downs(ope Berm Width:Mu(tip(ier (4.G)X Downslope Height (4_ )=Downslope Berm Width <br /> 5.32 x 4, ft = 25.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption idth (3.6 or 3.C)+4 ft. =ft <br /> 10.0 ft + 4 ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 4�: 25. ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0 <br /> L. Catculate Endslope Berm (4.K)X Downs(ope Mound Heigh[ (4.F)=Endslop Berm Width <br /> 3.00 ft X 4.7 ft = 14.0 ft <br /> M.Calculate Mound Width: Ups(ope Berm Width(4.D)+Bed Width (2.6)+Do slope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 t + 25.0 ft = 45.0 ft <br /> N. Calculate Mound Length:Ends(ope Berm Width (4.L)+Bed Length (2.C)+ nds(ope Berm Width (4.L)=ft <br /> 14.0 tt + 63.0 + 14.0 ft = 91.0 ft <br /> Comments: <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.