My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1 F)=Absorption Width <br /> 10.0 ft X 2. = 20.0 ft <br /> B. For slopes>1%, the Absorption Width is measured downhill from the upslo edge of the Bed. <br /> Calcutate Downsiope Absorption Width:Absorp[ion Width (3.A)-Bed Wid (2.6)=ft <br /> 20.0 ft - 10. ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Clean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C) Clean Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sa d Lift(optional): �2.0 <br /> B. Calculate Ups(ope Height:Ctean Sand Lift (4.A)+media depth (1 ft.j+co er (1 ft.)=Upslope Height <br /> 2.0 ft + 1.0 ft + 1.0 ft= 4. ft <br /> C�-3d:Slope.Muitiplirr TaGlr <br /> Land Slope� 0 � 2 3 4 5 � b 7 g 4 10 il 12 i3 la 15 IE 11 !B I4 i0 21 12 13 24 25 <br /> � Up51pG? 13:1 ;.A; 2.91.2.33;"t;5 Y.5$�2.51�2.5: �.d8 t.4't�L3512.31 2.2h 2.21 't.l' 't.i3 L�75 L'U5 2.i�; 2.(�' I.i1 IAi t.ii !.i':i I.E9 1.&?�1.8i <br /> i E�Ilil hd:'i� �d:t a-� 3.dS13.70 3.51 3.�5 3.3i 3.23 3.it 3.Oi 2.5�!'2.E5 2.?B 2JQ 2.b1 1.55 2.J8 2.dt 2.i9 2.29 2.23 t.t6 2.13 2.Od 2.03 1.y$ 1.9i <br /> LandSlope'-� 0 i 2 3 4 5 o i ? 8 9 �0 it 12 H la i6 Ib 17 i8 t9 2� il 22 � 1i 24 25 � <br /> i ��G',%IlilO�P ;3:1 I.[A; �.Or)i.'i 3 i'"v 3.�11 :5?�3.F5 3.PL 3.ii�4.11�4.29 �.i9 �1.69 �55 5.i�1 i.SS 5$8 6.?J 6,53 ?.U� '.-II 1.7J Q,a1 i=.���`3.� '0.021 <br /> � 6�I�fil Rd;'��� �id:l d.p}4.�1 J.'s9 ;.5�i �.lb S.C9 5.26 5.56 5.88 6.25 6,57 1J�1 7.64 8.29 8,92 9.57 10.2� 10.91 ii.67 12,-2 13.14 1J,44 t�.81 t5.67 !6.5: i1.�4.i <br /> � Select Upslope Berm Multip(ier <br /> (based on land stope): 2.54 (figure D-34) <br /> D. Calculate Upslope Berm Width:Mu(tip(ier (4.C)X Upslope Mound Height 4.6)=Ups(ope Berm Width <br /> 2.54 ft X 4. ft = 10.2 ft <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (2.8) X Land Slope (1. =100=Drop (ft) <br /> 10.0 ft x 6. % : �00= 0.60 ft <br /> F. Calculate Downslope Mound Height:Ups(ope Height (4.6)+Drop in Elevat n (4.E)=Downs(ope Height <br /> 4.0 ft + 0.6 ft = 4.6 ft <br /> G Select Downslope Berm Multip(ier <br /> (based on land slope): 5.26 {figure D-34) <br /> H. Calculate Downslope Berm Width:Mu(tip(ier (4.G)X Downslope Height (4 F)=Downslope Berm Width <br /> 5.26 x 4. ft = 24.2 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downslope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> �o.o ft + a ft = 14.o ft <br /> J. Design Downs(ope Berm =greater of 4H and 4i: 24. ft <br /> K. Setect Endslope Berm Multip(ier: 3.00 (usually 3.0 or 4. ) <br /> L. Calculate Ends(ope Berm (4.K)X Downslope Mound Height (4.F)=Ends(op Berm Width <br /> 3.00 ft X 4. ft = 13.8 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Do slope Berm Width (4.J)=ft <br /> 10.2 ft + 10.0 ft + 24.2 ft = 44.4 ft <br /> N. Calculate Mound Length:Endslope Berm Width (4.L)+Bed Length (2.C)+ ndstope Berm Width (4.L)=ft <br /> 13.8 ft + 63.0 t + 13.8 ft = 90.6 ft <br /> Comments: <br /> I� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.