My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-22 Septic Compliance
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
385 Stubbs Bay Road North - 32-118-23-31-0001
>
Septic
>
03-01-22 Septic Compliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:22 PM
Creation date
3/7/2022 12:44:58 PM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
385 Stubbs Bay Road North
Document Type
Septic
PIN
3211823310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Other Compliance Conditions - Compliance component #3 of 5 <br />3a. Maintenance hole covers appear to be structurally unsound (damaged, cracked, etc.), or unsecured? ❑ Yes' Q No ❑ Unknown <br />3b. Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety? ❑ Yes* ❑� No ❑ Unknown <br />'Yes to 3a or 3b - System is an imminent threat to public health and safety. <br />3c. System is non -protective of ground water for other conditions as determined by inspector? ❑ Yes* ❑� No ❑ Unknown <br />3d. System not abandoned in accordance with Minn. R. 7080.2500? ❑ Yes* ❑� No ❑ Unknown <br />*Yes to 3c or 3d - System is failing to protect groundwater. <br />Attached supporting documentation: M Not Applicable ❑ <br />4. Operating permit and Nitrogen BMP* - Compliance component #4 of 5 <br />Is the system operated under an Operating Permit? ❑ Yes ❑ No <br />Is the system required to employ a Nitrogen BMP specified in the system design? ❑ Yes ❑ No <br />BMP = Best Management Practice(s) specified in the system design. <br />ff the answer to both questions is "no", this section does not need to be completed. <br />Compliance Criteria: <br />a. Have the operating permit requirements been met? <br />b. Is the required nitrogen BMP in place and properly functioning? <br />Any "no" answer above indicates Noncompliance <br />Describe verification methods and results: <br />Attached supporting documentation: ❑ Operating Permit (Attach) <br />Property address: 385 Stubbs Bay Rd N, Orono Mn 55356 <br />Business Name: Ingleside Engineering & Constuction, Inc. <br />❑■ <br />Yes <br />LE <br />O Not applicable <br />If "yes", A below is required. <br />If "yes", B below is required. <br />3/1/2022 <br />wq-ww1sts4-3lc • 7/12/21 • www.pca.state.mn.us • Available in alternative formats • 651-296-6300 • 600-657-3864 • TTY 651-282-5332 or 800-657-3864 Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.