My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-22 Septic Compliance
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
385 Stubbs Bay Road North - 32-118-23-31-0001
>
Septic
>
03-01-22 Septic Compliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:22 PM
Creation date
3/7/2022 12:44:58 PM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
385 Stubbs Bay Road North
Document Type
Septic
PIN
3211823310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Basic Pump Selection Design: <br />UNIVERSITY <br />M C wool P enucy Worksheet OF MINNESOTA .� <br />1. PUMP CAPACITY Project ID: v 11.09.22 <br />Pumping to Gravity or Pressure Distribution: (( Q GI&Yk QQ Fr -e Selection required 2 <br />1. If pumping to gravity enter the gallon per minute of the pump: GPM (10 - 45 Wn) <br />2. if pumping to a pressurized distribution system: 29.0 GPM <br />/tine I of Pressure Distribution) <br />POMC Of <br />2. HEAD REQUIREMENTS t----� <br />A. Elevation Difference ft <br />between pimp and point of discharge: M« pip.E,, ,,,o ;...... 7 <br />dick e <br />B. Distribution Head Loss: ft <br />C. Additional Head Loss: E7777 --]ft (due to special equipment, etc.) <br />Distribution Head Loss <br />Gravity Distribution = Oft <br />Pressure Distribution based on Minimum Average Head <br />Value on Pressure Distribution Worksheet: <br />IlAnimum Average Head Distribution Head Loss <br />1ft 5ft <br />2ft 6ft <br />5ft 1 Oft <br />D. 1. Supply Pipe Diameter. 2.0 in <br />2. Supply Pipe Length: 320 ft <br />E. Friction Lou in Plastic Pipe per 100ft from Table h <br />Friction Losse 1 2.23 ft per Io0ft of pipe <br />F. Determine Equivalent Pipe Length from pump discharge to soil dispersal area discharge <br />point. Estimate by adding 25% to supply pipe length for fitting toss. Supply Pipe Length <br />(0.2) X 1.25 a Equivalent Pipe Length <br />320 it X 1.25 m 400.0 it <br />Table (.Friction Loss in P(astic..Pipe per 100ft <br />Flow Rate <br />fie Diameter (inches) <br />1 <br />1.25 <br />1.5 <br />1 2 <br />(GPM) <br />10 <br />9.1 <br />3.1 <br />1.3 <br />0.3 <br />12 <br />12.8 <br />4.3 <br />1.8 <br />0.4 <br />14 <br />17.0 <br />5.7 <br />2.4 <br />0.6 <br />16 <br />21.8 <br />7.3 <br />3.0 <br />0.7 <br />18 <br />9.1 <br />3.8 <br />0.9 <br />20 <br />11.1 <br />4.6 <br />1.1 <br />25 <br />16.8 <br />6.9 <br />1.7 <br />30 <br />23.5 <br />9.7 <br />2.4 <br />35 <br />12.9 <br />3.2 <br />40 <br />16.5 <br />4.1 <br />45 <br />20.5 <br />5.0 <br />50 <br />6.1 <br />55 <br />7.3 <br />60 <br />8.6 <br />65 <br />10.0 <br />70 <br />11.4 <br />75 <br />13.0 <br />85 <br />16.4 <br />95 <br />20.1 <br />G. Calculate Supply Friction Loss by multiplying Friction Loss Per 100ft (Line E) by the Equivalent Pipe Length (Line F) and divide by 100. <br />Supply Friction Loss - <br />2.23 ft per 100ft X 400.0 ft + 100 8.9 ft <br />H. Total Head requirement is the sum of the Elevation Difference (Line A), the Distribution Head Loss (Line e), Additional Head Loss (Line C), and the <br />Supply Friction loss (Line G ) <br />6.0 ft 5.0 ft + C=ft + 8.9 ft a 19.9 ft <br />3. PUMP SELECTION <br />A pump must be selected to deliver at least 29 GPM (Line 1 or Line 2) with at least 20 feet of total head. <br />
The URL can be used to link to this page
Your browser does not support the video tag.