My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-22 Septic Compliance
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
385 Stubbs Bay Road North - 32-118-23-31-0001
>
Septic
>
03-01-22 Septic Compliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:22 PM
Creation date
3/7/2022 12:44:58 PM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
385 Stubbs Bay Road North
Document Type
Septic
PIN
3211823310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABSORPTION AREA SIZING <br />Note: Mound setbacks are measured from the Absorption Area. <br />A. Calculate Absorption Width: Bed Width (2.8) X Mound Absorption Ratio (1.F) - Absorption Width <br />10.0 ft x 2.0 - 20.0 ft <br />B. For slopes >I%, the Absorption Width is measured downhill from the upslope edge of the Bed. <br />Calculate Downslope Absorption width: Absorption Width (3.A) - Bed Width (2.B) - ft <br />20.0 ft 10.0 ft <br />MOUND SIZING <br />A. Calculate Clean Sand Uft: 3 feet minus Depth to Limiting Condition (1.C) - Clean Sand Lift (1 ft minimum) <br />3.0 ft 1.7 ft - 1.3 ft Design Sand Lit (optional): 1.3 <br />B. Calculate Upslope Height: Clean Sand Lift (4.A) + media depth 0 ft.) + cover (1 ft.) - Upslope Height <br />1.3 ft 1.0 ft+ 1.0 ft. 3.3 ft <br />D•34: Slw Multiplier Table <br />Und Slope % 0 1 1 3 4 5 6 7 8 9 to t i 12 13 14 15 16 11 l8 19 20 21 22 23 24 25 <br />Upslwe 3:1 3.00 2.91 2.83 I.75 2.68 2.61 2.54 2.48 2,42.2,362,31J21612-2112,17 2.13 2.09 2.06 2.03 2.00 1.97 1.95 1.93 t.9t 1.89 124 12 5 <br />Bert Ratto 4;1 4.00 3.85 3.70 3.51 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 2.62 2.55 2.48 2.41 2.35 2.29 2.23 2.18 2.13 1.08 2.03 11.98 11.93 <br />Lind Slope % o I 1 1 1 3 14 5 6 1 8 9 110 1 11 -11T13 F14 15 16 17 1 1E 1 19 20 1 Zt I 22 23 24 25 <br />Go1m51ope J:1 1.00 3.04 3.19 3.30 3.41 3.53 3.66 3.E0 3.95 4.11 4.29 4.48 4.64 4.95 5.24 5.55 5.8E 624 6.63 1.04 1,4I 7.43 8.42 <br />Eig <br />t0.D2 <br />Belni Ratio 4:1 4.00.1.17 4.35 4.54 4.76 5.00 526 5.56 5.8E 6.25 6.67 7.14 1.69 8.29 E.91 957 1024 1094 11.67 12.42 13.19 13.49 14.82 17.44 <br />C. Select Upslope Berm Multiplier <br />(based on land slope): 3.33 (figure D-34) <br />D. Calculate Upslope Berm Width: Multiplier (4.C) X Upslope Mound Height (4.11) - Upslope Berm Width <br />3.33 ft x 3.3 ft - 11.0 ft <br />E. Calculate Drop in Elevation Under Bed: Bed Width (2.6) X Lara! Slope (1.D) + 100 - Drop (ft) <br />10.0 ft x 5.0 % + 100 = 0.50 ft <br />F. Calculate Downslope Mound Height: Upslope Height (4.6) + Drop in Elevation (4.E) - Downslope Height <br />3.3 ft + 0.50 ft = 3.8 ft <br />G. Select Downslope Berm Multiplier <br />(based on land slope): 1 5.00 (figure 0-34) <br />H. Calculate Downslope Berm Width: Multiplier (4.G) X Downslope Height (4.F) - Downslope Berm Width <br />5.00 x 3.8 ft 19.0 ft <br />1. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width (3.6 or 3.C) + 4 ft. - ft <br />10.0 ft 4 ft - 14.0 ft <br />J. Design Downslope Bean - greater of 4H and 41: 19.0 ft <br />K. Select Endslope Berm Multiplier: 1 3.00 (usually 3.0 or 4.0) <br />L. Calculate Endslope Berm (4.K) X Downslope Mound Height (4.F) - Endslope Berm Width <br />3.00 ft x 3.8 ft <br />M. Calculate Mound Width: Upslope Berm Width (4.D) + Bed Width (2.B) + Downslope Berm Width (4.J) - ft <br />11.0 ft + 1 10.0 ft + 19.0 ft - F 40.0 ft <br />N. Calculate Mound Length: Endslope Berm Width (4.L) + Bed Length (2.C) + Endslope Berm Width (4.1.) - ft <br />12.0 ft + 38.0 ft + 12.0 ft F 62.0 ft <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.