Laserfiche WebLink
� <br /> �'� <br /> ,�'� �'� <br /> ,, O '•, <br /> ,,. <br /> '�� '' CITY of O1ZON4► <br /> � �, <br /> �� 1 <br /> '' a j �, � <br /> �, <br /> , ; H ' Municipal Offices <br /> � "� ���, � �,, '� <br /> �,L �' , ;�� Street Address: Mailing Address: <br /> `9kEsKp4' 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Cunent Owner of Address �"� j 3 S �3� `�S�`� � <br /> City Ordinance requires that onsite se�vage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat - <br /> Yes <br /> No _�/ <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> I\To � <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s�Pump out Needed <br /> Yes e/ <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �-�p-c��- . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleanin�. <br /> Comments: <br /> ._.�r y �;, � P• : <br /> f�F <br /> Inspector:���l'���'` � �7 �� Date of Inspection � � � ° � <br /> Telephone(9�2)249-4600 < �'as (9�2) 249-4616 <br /> .c...i r. nrnnm m� ��c <br />