My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-2022 Development Contract
Orono
>
Property Files
>
Street Address
>
P
>
Pence Lane
>
2710 Pence Lane - 21-117-23-23-0051/46
>
Land Use
>
03-01-2022 Development Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:04:44 PM
Creation date
3/4/2022 10:06:50 AM
Metadata
Fields
Template:
x Address Old
House Number
2710
Street Name
Pence
Street Type
Lane
Address
2710 Pence La
Document Type
Land Use
PIN
2111723230061
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan A — Plat of Pence Lane, 2nd Addition <br />Plan B — Construction Plans for the Cul de Sac <br />8. IMPROVEMENTS. The Developer shall install and pay for the following as <br />required to be built in accordance with the approved Plans (the "Improvements"): <br />A. Site Grading and Erosion Control <br />B. Setting of Iron Monuments <br />C. Surveying and Staking <br />D. Private cul de sac <br />E. Traffic Control Signs and Street Signs <br />H. Stormwater Management Facilities <br />The Improvements shall be installed in accordance with the City subdivision ordinance; City <br />standard specifications for utilities and street construction; and any other ordinances including those <br />concerning erosion and drainage and any prohibiting grading, construction activity, and the use of <br />power equipment. The Developer shall submit plans and specifications which have been prepared <br />by a competent registered professional engineer to the City for approval by the City Engineer. The <br />Developer shall instruct its engineer to provide adequate field inspection personnel to assure an <br />acceptable level of quality control. In addition, the City may, at the City's discretion and at the <br />Developer's expense, have one or more City inspectors and a soil engineer inspect the work as the <br />City may reasonably determine. The Developer, its contractors and subcontractors, shall follow all <br />instructions received from the City's inspectors. The Developer's engineer shall provide for on-site <br />project management. The Developer's engineer is responsible for design changes and contract <br />administration between the Developer and the Developer's contractor. The Developer or its engineer <br />shall schedule a pre -construction meeting at a mutually agreeable time at the City Council chambers <br />with all parties concerned, including the City staff, to review the program for the construction work. <br />Within thirty (30) days after the completion of the Improvements and before the "security" is <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.