Laserfiche WebLink
-- -- --.._�._. <br /> � � � <br /> ����`���� <br /> (I� � � '�t, <br /> I r <br /> ���� CITY of U1ZON� <br /> � � !i <br /> � <br /> , , , �',� , ,��� � �l Municipal O�ces <br /> Street Address: Mailing Address: <br /> �t9 ' p4'�G 2750 Kelley Parkway P.O. Boz 66 <br /> ;..kESIT <br /> ��.-�:----- -- - Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> _....__. _ <br /> ,.� ' V <br /> To: The Cunent Owner of Address �—� I o � ) ���1 S}�c? <br /> City Ordinance requires that onsite sewage treatment s stems in Orono be <br /> inspected on a periodic basis. The onsite sewage treat ent system at the above <br /> address has been inspected and the followin� is known bout the system. A <br /> sketch of the known components of the system is avail ble for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 9 2-249-4626 within 10 <br /> days of receipt of this notice. The septic system must e brought into compliance <br /> within 90 days. Failure to do so will result in referral t the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other ' <br /> Septic Tank(s Pump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift ta be serviced and pumped <br /> out every three years. City records indicate the tank(s were last pumped out on <br /> $— � -(}tJ . The tank(s) should be cleaned hrough the manhole and <br /> not through the inspection pipes, this allows for prope cleaning. <br /> Comments: <br /> ,�; ,��� � ; .- <br /> Date of I s ection � � ° � <br /> Inspect�f;,-�d`'�`�'�.� � � P <br /> �'elephone (9�2) 2�9-4600 � �'at( ��) 249-461f� <br /> u�uu �i nrnnmm�.�ic <br />