Laserfiche WebLink
17 <br /> <br />Execute City Street Sign <br />Policy to replace worn or <br />damaged guide, warning, & <br />regulatory signs. <br />Signs Reduced As many as <br />possible <br />55 9 <br />Execute City Snow and Ice <br />Policy <br />Number of Snow and Ice <br />Events <br />NA 9 13 <br /> <br />Reduce chlorides used <br />through adoption of snow and <br />Ice best practices <br />Tons of salt per mile per event 0.25 0.7 1.82 <br />Gallons of Brine Pretreat per <br />mile per event <br />50 24 10 <br /> <br /> <br />8.03.2. Key Activities. Holiday decoration’s consisting of Flags, Banners and lighted decorations are put <br />on our street lights. To show honor and display holiday cheer and support to our community and our <br />veterans. <br /> <br />8.04. Stormwater Maintenance. The department’s goal is to protect property and the natural <br />environment from the effects of flooding and pollution through proactive maintenance of the stormwater <br />drainage system. The city maintains and extensive stormwater system consisting of431 culverts & Storm <br />Pipes, 11 outfalls, 433 catch basins and 16 storm ponds. <br /> <br />8.04.1. By the Numbers (Metrics). <br /> <br />8.04.2. Key Activities. Town line Road was ditched to improve drainage. <br /> <br />8.05. Sanitary Sewer Maintenance. The department’s goal is to provide a safe and efficient sanitary <br />sewer collection system The sanitary sewer system consists of 329,728 feet of sewer main, 1230 <br />Manholes, 46 Lift Stations, 18 Backup Generators serving 2253 customers <br /> <br />8.05.1. By the Numbers (Metrics). <br />Strategy Measure Target 2020 2021 <br />Clean and Inspect all city sewers at <br />least every five years to identify area <br />requiring maintenance or possible I&I <br />Feet of sewer main <br />cleaned/televised/ inspected <br />100% of <br />maintenance <br />Area <br />58,579 37,303 <br />Number of sewer Backups 0 1 2 <br />Strategy Measure Target 2020 2021 <br />Decrease the risk of flooding for <br />facilities <br /># of structures flooded 0 0 0 <br />Reduce pollutants from entering the <br />stormwater system and surface water <br />bodies through street sweeping. <br />Cubic Yards of <br />sweepings removed <br />from city streets <br />Increasing trend ↗ 54 23 <br />Pounds of phosphorus <br />removed <br />Increasing trend ↗ 23.75 ~11.5 <br /> <br />Proactively maintain the system by <br />inspecting 1/5 of the system each year <br />and using those inspections to inform <br />maintenance activities. <br />Number of Structures <br />inspected <br />100% of Maintenance <br />Area <br />82 91 <br /> <br />Number of structure <br />replaced or repaired <br />As needed 10 1 <br /># Of ponds Inspected 100% of Maintenance <br />Area <br />0 4