My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2022 Council Packet
Orono
>
City Council
>
2022
>
02-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 3:20:52 PM
Creation date
2/15/2022 3:18:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br /> <br />Prepared By: SO Reviewed By: A. Carlson Approved By: <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain approval to proceed with Lift Station <br />Rehabilitation projects for 2022. <br /> <br />2. Background. The Sewer Department has developed a maintenance plan for the 46 lift/ grinder <br />stations that are part of the sewer system. As part of the plan, each station is inspected annually to identify <br />routine maintenance needs. In addition to routine maintenance, the plan also includes the upgrade of two <br />lift stations per year. A lift station upgrade involves replacing discharge piping, pumps, and control panel <br />and all electrical that operates the lift station. The lift stations that are upgraded are selected based on a <br />number of factors: age, maintenance records, issues discovered during the annual inspection and the risks <br />associated with the failure of the lift station. Lift Station 3 (3400 East Lake St) was reconstructed in 1992 <br />and Lift Station 11 (1813 Fagerness Point Rd) was constructed in 1991 and both lift stations surpassed <br />their life expectancy. Maintenance costs are increasing due to their age and the outdated technology of the <br />controls and pumps. <br /> <br />3. Project Scope. Installation of new control panels, two new pumps per station, discharge piping and <br />all electrical work. <br /> <br />4. Cost. We have solicited three quotations for Lift Station 3 and Lift Station 11 upgrades, listed below. <br />The lowest quote from a qualified contractor was $95,200 from Quality Flow Systems Inc. <br /> <br />Company Company / Model Cost <br />Quality Flow Systems Inc. new control panel, two new pumps, discharge piping and all electrical work $95,200.00 <br />Quality Flow Iowa Inc. new control panel, two new pumps, discharge piping and all electrical work $100,110.00 <br />Kriha Electric, LLC new control panel, two new pumps, discharge piping and all electrical work $104,100.00 <br /> <br />5. Funding. This project will be funded through the Sewer Fund. <br />Fund Cost CIP Estimate Projected EOY 2022 Fund Balance <br />Sanitary Sewer $95,200.00 $ 155,000 $1,895,052 <br /> <br />6. Staff Recommendation. I recommend acceptance of the quote provided by Quality Flow, Inc. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to approve in the amount of $95,200.00 from Quality Flow Systems Inc. of New Prague, <br />Minnesota <br />Item No.: 6 Date: January 14, 2022 <br />Item Description: Approve Rehabilitation of Lift Station 3 (3400 East Lake St) and Lift <br />Station 11(1813 Fagerness Point Road) <br />Presenter: Scott Oberainger, <br />Public Works Supervisor <br />Agenda <br />Section: <br />Consent Agenda <br />
The URL can be used to link to this page
Your browser does not support the video tag.