Laserfiche WebLink
Sewer $50.00 <br />SAC (Sewer Availability Charge) (MCES)$2,485.00 <br />Water $50.00 <br />Horn Quote Basis <br />Connection inspection (Water or Sewer) $100.00 <br />Disconnection inspection (Water or Sewer)$100.00 <br />Residential - City Inspection $250.00 <br />Residential - Private Inspection Review $100.00 <br />Commercial $750.00 <br />Connection to existing City Sewer System: $5,380.00 <br />Fee <br />2004 North Long Lake East Extension $16,495.00 <br />2004 West Farm/Homestead $9,900.00 <br />2005-1 Webber Hills/S Brown Rd Ext $14,990.00 <br />2005-1 Dickey Lake Dr N $19,125.00 <br />2006-1 Jamestown Road $15,930.00 <br />2007 Farview Lane Sewer $12,025.00 12,775.00$ <br />2010 North Farm Road $20,020.00 21,270.00$ <br />2014 Green Trees $21,830.00 22,800.00$ <br />2015 Green Trees Extension $20,890.00 21,775.00$ <br />Connection to Sewer System in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake <br />Fee Schedule <br />Connection to Wayzata Sewer System $1,000 or per current Wayzata Fee <br />Schedule <br />POINT OF SALE SEWER SERVICE INFLOW & INFILTRATION INSPECTION FEES <br />Exhibit C Utility Rates and Fees <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing <br />water and wastewater utility services to new customers to avoid placing these costs on existing customers. The connection fee <br />includes those portions of existing assets that will benefit new customers together with any anticipated future capital <br />improvements constructed for the purpose of providing utility services to new customers. The connection charge applies to <br />those properties not previously assessed for the associated utility project. <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) <br />shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the <br />project: <br />MUNICIPAL CONNECTION PERMIT <br />SEWER PROJECTS <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES