My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-06-2021 Council Packet
Orono
>
City Council
>
1950-2024
>
2021
>
12-06-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 8:10:31 AM
Creation date
1/25/2022 8:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />operating interest expense is for the interest on the 2014 Water Bonds. <br /> <br />2022 capital expenditures as identified in the 2022 CIP include a water main replacements and work at the <br />south water plant. The 2022 capital expenditures total $798,440. ARPA funding is being utilized for <br />$500,000 of the capital expenditures. The Water Fund’s anticipated cash balance for the fund at the end of <br />2022 is $742,000. <br /> <br />b. Sewer. In recent years, the sewer fund has mostly operated at a loss. Non-operating revenues <br />however, have consistently offset the operating losses. This has resulted in a positive operating cash flow <br />for the fund. <br /> <br />The single largest expense for the sewer fund is the Met Council disposal charges. The five years have <br />seen increases in the amounts of $37,410 (9.5%), $41,276 (9.6%), $82,147 (17.4%), $64,035 (11.5%) and <br />$81,200 (13.1%) respectively. For the 2022 budget, the Met Council charges will remain flat. <br /> <br />The total operating expenditure budget is increasing by $72,100 (3.79%) The majority of this increase is <br />for wages and benefits. The operating transfer of $115,000 is to cover the sewer improvements that were <br />part of the Casco Point project and will continue for another three years. <br /> <br />Upcoming capital expenditures can be covered by the fund’s current cash balances. Projects identified in <br />the CIP for 2021 include: Annual sewer rehabilitation ($150,000), an additional generator ($25,000), <br />grinder station rehabs ($35,000), lift station updates ($120,000), additional road project adjustments <br />($76,500), sewer meter installation into Long Lake ($60,000), and force main replacements (355,200) for <br />a total of $821,700. ARPA funding is being utilized for $355,200 of the capital expenditures. The <br />anticipated cash balance for the fund at the end of 2022 is $1,800,000. <br /> <br />c. Stormwater. The Stormwater Fund is for the most part project based. Operating expenditures are <br />mainly limited to engineering associated with NPDES, SWPPP and other state and federal requirements. <br />Public Works time and materials spent on culvert cleaning/replacement are also charged to this fund. The <br />purpose of this fund is to collect money for the larger Stormwater projects that will be required in the future. <br /> <br />Potential CIP projects in 2022 include: Navarre Parking Lot ($35,000), North Shore Drive Ravine <br />($96,000), Road Projects ($208,300), and Storm Sewer Improvements ($100,000). The capital <br />expenditures total $459,300. The anticipated cash balance for the fund at the end of 2022 is $1,500,000. <br /> <br />d. Recycling. The recycling funds major expenditure line is for contracted recycling charges. The <br />current contract with Waste Management is increasing 4%. The Recycled Materials has weakened in the <br />past few years since 2018. The full time wages that are charged to the fund represent 10% of the City <br />Clerks wages. The anticipated cash balance for the fund at the end of 2020 is $70,382. <br /> <br />e. Cable. The Cable funds projected revenues are based on current subscriber information and <br />rates. The line item for Internet/Other communications covers the costs associated with streaming and <br />online access of council meetings. It has been increased to pay for the increased cost of our fiber internet <br />connection. Revenue for the fund is in the from franchise fees that are set by the City’s franchise <br />agreement with Mediacom. The current cash balance of the fund is $169,102. <br /> <br />9. Construction Funds. The City does not adopt formal budgets for construction funds. Possible <br />projects for these funds can be found in the CIP. The CIP is a planning tool only; approval of the CIP not <br />approve or authorize any purchases. The projects identified in it will require individual approval from the <br />Council before they can be started. <br />
The URL can be used to link to this page
Your browser does not support the video tag.