My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-06-2021 Council Packet
Orono
>
City Council
>
2021
>
12-06-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 8:10:31 AM
Creation date
1/25/2022 8:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />released, the Developer shall supply the City with a complete set of reproducible "as constructed" <br />Plans, and an electronic file of the "as constructed" Plans in an auto CAD file based upon the <br />Hennepin County coordinate system, all prepared in accordance with City standards. <br /> 9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.02 <br />and the Orono City Code, the final placement of iron monuments for all lot corners must be <br />completed before the “security” is released. The Developer's surveyor shall submit a written notice <br />to the City certifying that the monuments have been installed. <br /> 10. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain all necessary permits, including but not limited to the following to the <br />extent required: <br />• MnDNR for Dewatering <br />• City of Orono for Building Permits <br />• MCWD for erosion control permit and storm water management permit <br />• General Construction Permit (NPDES: National Pollutant Discharge Elimination <br />System) from MPCA <br />11. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer’s and the Developer’s contractors’ and subcontractors’ <br />responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br />the level of effort needed to perform dewatering and storm flow routing operations. All <br />dewatering shall be in accordance with all applicable county, state, and federal rules and <br />regulations. DNR regulations regarding appropriations permits shall also be strictly followed. <br /> 12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br />contemplated by Section 8 and the approved Plans by December 31, 2022, with the exception of <br />the final wear course of asphalt on the cul de sac. The final wear course shall be installed between
The URL can be used to link to this page
Your browser does not support the video tag.