Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7234 <br /> <br /> <br />2 <br /> <br />2. The Property is located in the LR-1B Zoning District. <br /> <br />3. The property is guided for Low Density Residential in the 2040 Community Management <br />Plan. <br /> <br />4. The Property contains 4.57 acres (199,260 sq. ft.) in area. <br /> <br />5. The properties currently are divided into two buildable lots and an outlot. <br /> <br />6. The parcel will be platted into 2 buildable lots and one outlot. All buildable lots conform <br />to the size requirements of the city code. <br /> <br />7. The Developer has prepared plans to construct a private cul de sac at the southern terminus <br />of Pence Lane, a private road. <br /> <br />8. The Parks, Trails and Open Space element of the Orono Community Management Plan <br />(CMP) has no current plans for parks that specifically require dedication of park land from <br />this property. <br /> <br />9. The property was previously platted as Pence Lane Addition in 2018 (LA18-000092). This <br />approval was granted as part of Resolution 6918. The property owner wishes to revise the <br />conditions applicable to the properties, specifically those related to access restrictions for <br />lots 1 and 2. <br /> <br /> <br />CONCLUSIONS, ORDER AND CONDITIONS: <br /> <br />1) Approval is subject to Minnehaha Creek Watershed District (hereinafter the “MCWD”) <br />approval and permits as required. <br /> <br />2) Approval is subject to City Engineer final approval of construction drawings; the final plat <br />shall not be released for recording without City Engineer approval. <br /> <br />3) Erosion control shall adhere to "Best Management Practices for Protecting Water Quality <br />in Urban Areas" and to the approved SWPPP. All erosion controls as required by the City <br />and the MCWD shall be in place and approved prior to commencing grading and <br />excavation on the site. All such erosion control measures shall be maintained in working <br />order until the site is vegetated and stabilized.