My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-06-2021 Council Packet
Orono
>
City Council
>
2021
>
12-06-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 8:10:31 AM
Creation date
1/25/2022 8:02:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Connection to existing City Sewer System: $5,380.00 <br />Fee <br />2004 North Long Lake East Extension $16,495.00 <br />2004 West Farm/Homestead $9,900.00 <br />2005-1 Webber Hills/S Brown Rd Ext $14,990.00 <br />2005-1 Dickey Lake Dr N $19,125.00 <br />2006-1 Jamestown Road $15,930.00 <br />2007 Farview Lane Sewer $12,025.00 12,775.00$ <br />2010 North Farm Road $20,020.00 21,270.00$ <br />2014 Green Trees $21,830.00 22,800.00$ <br />2015 Green Trees Extension $20,890.00 21,775.00$ <br />Connection to Sewer System in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake <br />Fee Schedule <br />Connection to Wayzata Sewer System $1,000 or per current Wayzata Fee <br />Schedule <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) <br />shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the <br />project: <br />SEWER PROJECTS
The URL can be used to link to this page
Your browser does not support the video tag.