My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4300 Watertown - Condemnation Hearing Info
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4300 Watertown Road - 31-118-23-13-0013
>
Correspondence
>
Co Rd 6 Upgrade-Condemnations (1. Hanning 2. Johnson)
>
4300 Watertown - Condemnation Hearing Info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:18 PM
Creation date
1/21/2022 3:06:29 PM
Metadata
Fields
Template:
x Address Old
House Number
4300
Street Name
Watertown
Street Type
Road
Address
4300 Watertown Road
Document Type
Correspondence
PIN
3111823130013
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J-P TESTING, INC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License #394 <br /> November 29, 1999 <br /> Johnson Property <br /> Lot 1 & part of Lot 2 <br /> 4300 Watertown Rd. <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type 1, five bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - LmB - Lerdal loam. The seasonally <br /> saturated soils were located at 16" to 40" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. the <br /> length of the rock bed would be reduced approximately 13' per bedroom removed. <br /> The soils at a depth of 12" have a percolation rate of 3.5 mpi. <br /> A lift pump will be needed in the lower level to keep the tanks shallow. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.