My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-2021 Council Packet
Orono
>
City Council
>
2021
>
03-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:40:34 AM
Creation date
1/14/2022 10:23:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H:\ORNO\2021 New Projects\Fee Estimate - PW Water and Sewer Extension - Revised.docx <br />March 3, 2021 <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br />RE: Public Works Water and Sewer Extension – Revised Fee Estimate <br />Dear Adam: <br />Based on the City’s request for proposals , we have prepared a scope of services and design fee estimate <br />for the extension of water and sewer service to the proposed public works site. It is our understanding <br />that the scope of the project will include the following: <br />•Extend watermain under Hwy 12 and the railroad by trenchless construction methods. <br />•Extend a sanitary sewer forcemain under Hwy 12 and the railroad by trenchless construction <br />methods. <br />Proposed Scope of Engineering Services <br />To assist the City with this improvement project, Bolton & Menk proposes the following scope of <br />services: <br />Topographic Survey – We will document existing conditions in the areas of the boring pits on each side <br />of the highway and will rely on the highway record plans for the work that will occur within Mn/DOT’s <br />right of way. <br />Staff Design Meetings – Our team will work with City staff to develop the scope of the project and to get <br />input on design details. The goal of these meetings is to ensure that the project is designed consistent <br />with City standards and that the City’s maintenance practices and operations are considered throughout <br />the design process. <br />Detailed Design and Bidding – Once the final scope of the project is determined, Bolton & Menk will <br />prepare detailed plans and specifications for the water and sewer crossings of HWY 12 and will obtain all <br />necessary permits. Our scope of services will not include design of the grinder pump that will be required <br />to serve the site of the new public works facility. Detail design of the pump and controls will occur with <br />the site design for the new building. <br />Upon authorization, the project will be advertised for competitive bids. Bolton & Menk will administer <br />the bidding process and will ultimately make recommendations to the City Council about awarding the <br />project. <br />Fee Estimate <br />Based on the scope of services described above, we propose a not -to -exceed fee of $29,000 to be billed on <br />an hourly basis. Once the Construction Contract is awarded, Bolton & Menk will prepare a separate <br />scope and fee estimate for construction phase services. <br />Exhibit B
The URL can be used to link to this page
Your browser does not support the video tag.