Laserfiche WebLink
Prepared By: Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is for Council to award the East Long Lake Trail Project. <br /> <br />2. Background. At the May 29th, 2018 meeting, the City Council directed staff and the Parks <br />Commission to develop a plan for the conversion of northern section East Long Lake Road to a trail. . <br />The commission, city staff and our consultant have held several meeting and developed a concept plan for <br />the trail. The Council approved the plan on November 26th, 2018. In March of 2019 the city applied for <br />and in July of 2019 was awarded a Grant from the MnDNR for $150,000 for the project. The grant <br />contract prerequisites were met and the contract prepared by the DNR in June 2020. The original design <br />for the project included raising the trail through the low area at the north end. That area of the roadway <br />floods annually. During the preliminary permitting process we learned that this was going to require <br />significant modeling, design and mitigation expenses in order to be approved. Therefore we change the <br />plan to include a boardwalk though that area. Based on preliminary cost estimates we assumed some risk <br />during flood events and shortened the boardwalk to get the project within budget. <br /> <br />3. Project Scope. The scope of work includes removal of the existing asphalt, stabilizing the lakeshore <br />where required, construction of a 10ft wide multipurpose trail, boardwalk, overlook point, and <br />interpretive signage. <br /> <br />4. Cost. The City received 7 bids. The low bid was from Blackstone Contractors for $268,688.44. <br />The bid from Blackstone is well below the engineers estimate. Therefore we recommend adding back as <br />much boardwalk into the project as we can with in the budget via a change order. <br />Item Cost Comments <br />Design and Engineering $ 52,050.00 NTE- Previously approved <br />Construction $ 268,688.44 To be approved <br />Change Order (additional Boardwalk) $ 28,100.00 <br />Construction Management $ 62,150.00 NTE- To be approved. Includes boardwalk design <br />change fee. <br />TOTAL $ 410,988.44 <br /> <br />5. Funding. The MnDNR grant will fund $150,000 of the project cost. The remaining $260,520 would <br />paid from the Parks Enterprise and Stormwater funds. <br />Funding Source Amount Projected/ Budgeted <br />MnDNR Grant $ 150,000 <br />Park Enterprise Fund $ 134,000 <br />Stormwater Fund $ 127,000 <br />TOTAL $ 411,000 <br /> <br />6. Project Timeline. <br />When What <br />July 13th, 2020 Award <br />July-October 2020 Construction <br /> <br />7. Staff Recommendation. I recommend award to Blackstone and authorization to execute a change <br />order to increase the length of the boardwalk. <br /> <br />Item No.: 11 Date: July 13, 2020 <br />Item Description: East Long Lake Trail Project (20-029) – Award <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda