AGENDA ITEM <br />Prepared By:Reviewed By: DJR Approved By: DJR <br />1.Purpose. The purpose of this action item is to award the 2020 Sanitary Sewer Rehabilitation Project. <br />2.Background. Metropolitan Council Environmental Services (MCES) provides sanitary sewer <br />treatment for the majority of communities (including Orono) in metropolitan area. Since 2005, MCES has <br />identified Orono as one of the communities who contribute excessive Inflow and Infiltration (I & I). The <br />City has been executing a sanitary sewer rehabilitation project annually to reduce I&I. Each year the City <br />works to identify inflow and infiltration points within the sanitary sewer system thought our annual <br />inspection program. These sites then inform our rehabilitation efforts for the year. In 2020 the City <br />received a excessive flow work plan assignment from MCES based on excessing flows in 2019 for <br />$363,540. I&I mitigation projects in 2020-24 may be used to accomplish the assignment. <br />3.Scope. The project includes the lining of 5,427 feet of Sewer Main and rehabilitation (sealing) of 32 <br />sanitary sewer manholes. (Exhibit A) <br />4.Cost. The city received Bids from 3 contractors (Exhibit B). The low bid was for $ 275,718.18 from <br />Insituform Technologies. In addition to the construction cost, Bolton and Menk provided a proposal of <br />NTE $25,000 for construction oversight and $10,000 for additional design work for the manhole portion <br />of the project. (Exhibit C) <br />Who Work Cost Status <br />Bolton &Menk, Inc Design and Engineering $ 19,200.00 Not to exceed, Previously approved <br />Bolton &Menk, Inc Design and Engineering $ 10,000.00 Not to exceed, Additional Design work <br />Insituform Technologies Construction $ 275,718.18 Pending award <br />Bolton &Menk, Inc Construction Oversight $ 25,000.00 Not to exceed <br />Total $ 329,918.18 <br />5.Funding. The project is funded from the Sanitary Sewer Fund. The CIP and Annual Public works <br />plan have $290,000 allocated for this year’s project. The projected 2020 yearend balance is $1,287,310 <br />6.Staff Recommendation. I recommend council award the project. While the overall cost of the <br />project exceeds the original planning estimates the work needs to be done and will be used to comply with <br />our exceedance work assignment. <br />COUNCIL ACTION REQUESTED <br />Motion to award the 2020 Sanitary Sewer Rehabilitation project to Insituform Technologies for <br />$275,718.18 and to authorize Bolton and Menk to perform design and construction oversight for a fee not <br />to exceed $ 35,000. <br />Exhibits <br />A.Project Map <br />B.Bid Summary <br />C.Bolton and Menk Proposal. <br />Item No.: 9 Date: July13, 2020 <br />Item Description: Sewer Rehabilitation Award <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda