My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-2020 Council Packet
Orono
>
City Council
>
2020
>
04-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:39:01 AM
Creation date
1/13/2022 10:28:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. !Ji ~. 'r 9! <br />8. Grading and Drainage Requirements. General site grading shall be in confmmance with the <br />approved Grading, Drainage and Erosion Control Plan, subject to the recmmnendations <br />of the City Engineer in his letter dated January 13, 2005. During development within <br />individual lots, wherever feasible, individual chiveways shall be graded to drain toward the <br />road storm sewer system Wherever feasible, individual yard areas shall be graded to drain <br />toward the road storm sewer system. Wherever feasible, roof gutter systems shall be <br />installed to discharge roof rnnoff so that it will drain toward the road storm sewer system. <br />9, Sign age and Lighting. No street lighting or development identificationsiguage has been <br />approved for Creekside In Orono, Any such proposed lighting or signage shall be subject <br />to prior City approval, which may require public hearings. <br />10. City Engineer Approval, Approval of all improvements is subject to recommendations of <br />City Engineer Thomas Kellogg as noted in his comments dated January 13, 2005, <br />11. Minnehaha Creek Watershed Dist1ict Approval, This subdivision approval is subject to <br />MCWD approvals and permits as required. The final plat shall not be released for filing <br />until the Developer has provided evidence that all required MC\,VD permits have been <br />obtained, <br />12. Developers Agreement. The plat shall not be released for filing until the Developer has <br />executed a Developer's Agreement per the conditions ofResolutionNo. 5204, including <br />a letter of creditWJitten to 150% of the cost of the proposed site improvements, including <br />any required landscaping, <br />13. Site Improvements: Building Permit Issuance. No land alterations shall take place until <br />erosion control is established and the City Engineer has approved all final improvement <br />plans. No building pemiits will be issued until all drainage facilities and improvements have <br />been installed and satisfactory road base (including road base and the initial lift of <br />bituminous) has been installed. <br />14. The City Clerk shall release the plat documents for filing only upon ce1tification by the City <br />Attorney and Planning Director that all requirements of the platting regulations have been <br />satisfied. <br />Page 6 of 8
The URL can be used to link to this page
Your browser does not support the video tag.