My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-2020 Council Packet
Orono
>
City Council
>
2020
>
04-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:39:01 AM
Creation date
1/13/2022 10:28:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H:\ORNO\C13120000\1_Corres\Bid Island Construction Services 4-8-20.docx <br /> <br />April 8, 2020 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br /> <br />RE: Big Island Improvements Project - Construction Services <br /> <br />Dear Adam: <br /> <br />As requested, we have prepared a scope of services and estimated fee for the construction services <br />associated with the Bid Islands Park Improvements Project. It is our understanding that our service will <br />include limited survey work and part time construct ion observation just to ensure general compliance with <br />the plans and specifications for the project. <br /> <br />Scope of Services <br /> <br />Construction Staking and Observation <br />Limited survey crew time will be provided to assist with determining cuts and fills needed to meet ADA <br />trail requirements and the centerline of the trails will be documented for record drawing purposes. Part <br />time construction observation will also be provided. Duties of the Construction Observer will include the <br />following: <br />• Attendance at the pre-construction meeting and all construction -related meetings <br />• Serve as a liaison between the City and the contractor <br />• Review of the completed work to determine if the project is in general conformance with the <br />plans and specifications <br />• Maintenance of constructio n documentation <br /> <br />Construction Administration <br />Up to Construction administration duties will include the following: <br />• Administering a pre-construction meeting and construction meetings, as needed <br />• Review of shop drawings <br />• Preparation of pay estimates <br />• Contractor Communications <br />• Liaison with City Staff and Council <br /> <br />Record drawings detailing the completed improvements as recorded by the construction observer and the <br />City of Orono’s contractor will be completed and furnished to the City in hard copy and ele ctronic format. <br />Record plans will also be li nked to the City mapping system and the City’s GIS system will be updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.