Page | 13 March 9, 2020 <br /> <br />ARTICLE XIV. - INTERIM USES 431 <br /> 432 <br />DIVISION 1. - GENERALLY 433 <br /> 434 <br />Sec. 78-1726. - Interim use permit required. 435 <br />An application for an interim use permit shall be accompanied by a certified site plan showing the 436 <br />location of the proposed excavation or storage and shall state the amount of material which is to be 437 <br />removed, excavated or stored, placed, or graded, and such other information as the council may require. 438 <br />Applications shall be filed with the city administrator and shall be accompanied by a deposit to be 439 <br />determined by the city, which will be used to offset the cost of processing the application. Any unused 440 <br />portion will be refunded to the applicant. 441 <br />(a) Except where otherwise provided in the article, it is unlawful for any person to perform or have 442 <br />performed the following land alteration activities without an interim use permit issued by the 443 <br />council: 444 <br />(1) Mining. The commercial extraction of sand, gravel or other material from the land and their 445 <br />removal from the site without processing shall be mining. In all districts, the conduct of 446 <br />mining shall be permitted only upon issuance of a interim use permit. Such permit shall 447 <br />include, as a condition, a plan for a finished grade which will not adversely affect the 448 <br />surrounding land or development of the site on which the mining is being conducted, and the 449 <br />route of trucks moving to and from the sites. A bond will be required for restoration 450 <br />(2) Soil processing. The operation of processing of sand, gravel or other material mined from 451 <br />the land shall be permitted only by interim use permit. Such permit shall include a site plan 452 <br />where the processing is to be done, showing the location of the plant, disposal of water, route 453 <br />of trucks moving to and from the site in removing processed material from the site, the 454 <br />condition in which the site is intended to be left upon completion, hour of operation; and 455 <br />such permit shall not be granted for a period of longer than 12 months 456 <br />(3) Creation of an engineered grade for the basis of building height determination outside of a 457 <br />subdivision. 458 <br />(4) Unless included as part of a permitted project or as exempted below, the following activities 459 <br />require a separate Interim Use Permit. 460 <br /> 461 <br /> 462 <br />Location <br />Lake Yard or Shore <br />Setback Zone <br />Activity in the <br />Shoreland Overlay <br />District, but outside <br />the Lake Yard <br />All other areas, lots <br />5 acres or less <br />All other areas, lots <br />greater than 5 acres <br />Grading More than 10 CY, or <br />more than 1,000 sq <br />ft of disturbed area <br />More than 2,500 cy, <br />or more than 10,000 <br />sq ft of area <br />More than 2,500 cy, <br />or more than 10,000 <br />sq ft of area <br />More than 5,000 cy, <br />or more than 20,000 <br />sq ft of area <br />Import/ Export More than 500 CY More than 500 CY More than 2,500 CY More than 5,000 CY <br />Stockpiling Stockpiling more <br />than 90 days <br />Stockpiling more <br />than 180 days <br />Stockpiling more <br />than 180 days <br />Stockpiling more <br />than 180 days <br />ACTIVITY <br />Formatted: Not Highlight <br />Commented [JB23]: If import of material exceeds 500 cy <br />is necessary to repair slope failure, an IUP (6 weeks) is <br />required.