My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-2020 Council Packet
Orono
>
City Council
>
2020
>
04-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:39:01 AM
Creation date
1/13/2022 10:28:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
Sticky Note
ID:
1
Text:
Higher standard. All of these thresholds are more strict than minimums.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page | 9 March 9, 2020 <br /> <br />Sec. 78-1592 Permit Required 310 <br /> 311 <br />1. Administrative Ppermit required. 312 <br />A plan showing proper drainage and protection of adjoining properties shall be submitted. The city 313 <br />engineer shall have the authority to refer any requests for land alteration permits to the city council for 314 <br />review and approval in instances where the land alteration appears to create negative impacts or be 315 <br />inconsistent with the goals and policies of the community management plan. 316 <br />(a) (a) Unless approved as part of a project in which a permit has been issued, a separate land 317 <br />alteration permit shall be required for the following. 318 <br /> 319 <br />An active building permit or separate land alteration permit is required for the following: 320 <br />(1) Normal and customary grading in the area of an existing or a newly constructed building; or 321 <br />the grading of the driveway serving such building; and less than 500 cumulative 322 <br />import/export of material, except for fill required to raise grade for adequate frost footing 323 <br />protection, the intent being that structures shall not be artificially raised above the preexisting 324 <br />surrounding topography. 325 <br />(2) Import/export of 51—500 cubic yards which does not adversely impact the existing drainage, 326 <br />(3) Changing the grade on a lakeshore property within the shore setback up to 50 cubic yards. 327 <br />a. Exception. A building permit or land alteration permit is not required for earth movement 328 <br />50 cubic yards or less outside the shore setback. 329 <br />(4) Repair or restoration of grade within the shore setback provided import/export does not 330 <br />exceed 500 cubic yards to reestablish existing/ failing slope with engineer review. 331 <br />(5) Stockpiling less than 500 cubic yards of material provided that the following documents be 332 <br />submitted: 333 <br />a. An erosion control plan, meeting the standards of chapter 79; and 334 <br />b. Proposed haul routes. 335 <br />(6) Installation of septic systems in accordance with chapter 58, Environment, article II, on-site 336 <br />sewage disposal. 337 <br />(7) Grading, excavation, or fill which is greater than or equal to 50 CY or disturbs5,000 square 338 <br />feet. 339 <br />Location <br />Lake Yard or Shore <br />Setback Zone <br />Activity in the <br />Shoreland Overlay <br />District, but outside <br />the Lake Yard <br />All other areas, lots <br />that are 5 acres or <br />less <br />All other areas, lots <br />greater than 5 acres <br />in size <br />Grading 0-10 Cubic yards, or <br />0-1,000 sq ft of arfea <br />50-2,500 cubic yards, <br />or 5,000-10,000 sq ft <br />of area <br />50-2,500 cubic yards, <br />or 5,000-10,000 sq ft <br />of area <br />50-5,000 cubic yards, <br />or 5,000-20,000 sq ft <br />of area <br />Import/ Export Between 10 CY and <br />up to 500 CY <br />Between 50 and 500 <br />CY <br />Between 50 and <br />2,500 CY <br />Between 50 and <br />5,000 CY <br />Stockpiling Up to 90 days Up to 180 days Up to 180 days Up to 180 days <br />ACTIVITY <br />Commented [JB15]: Unless part of a permitted project…. <br />The Planning Commission suggested breaking the “all other <br />areas” into two sections. <br />Commented [JB16]: The following activities do not <br />require a separate permit IF part of a permitted project. <br />Commented [JB17]: If import of soil is greater than 500 <br />CY to repair a slope failure, a IUP will be required.
The URL can be used to link to this page
Your browser does not support the video tag.