Laserfiche WebLink
Location <br />Lake Yard or Shore  <br />Setback Zone <br />Activity in the  <br />Shoreland Overlay  <br />District, but outside  <br />the Lake Yard <br />All other areas, lots  <br />that are 5 acres or  <br />less <br />All other areas, lots  <br />greater than 5 acres  <br />in size <br />Grading 0‐10 Cubic yards, or 0‐ <br />1,000 sq. ft. of area <br />50‐2,500 cubic yards,  <br />or 5,000‐10,000 sq. ft.  <br />of area <br />50‐2,500 cubic yards,  <br />or 5,000‐10,000 sq. ft.  <br />of area <br />50‐5,000 cubic yards,  <br />or 5,000‐20,000 sq. ft.  <br />of area <br />Import/ Export Between 10 CY and  <br />up to 500 CY  <br />Between 50 and 500  <br />CY <br />Between 50 and 2,500  <br />CY <br />Between 50 and 5,000  <br />CY <br />Stockpiling Up to 90 days Up to 180 days Up to 180 days Up to 180 days <br />Activity <br />Grading More than 10 CY, or  <br />more than 1,000 sq.  <br />ft. of disturbed area <br />More than 2,500 cy,  <br />or more than 10,000  <br />sq. ft. of area <br />More than 2,500 cy,  <br />or more than 10,000  <br />sq. ft. of area <br />More than 5,000 cy,  <br />or more than 20,000  <br />sq. ft. of area <br />Import/ Export More than 500 CY More than 500 CY More than 2,500 CY More than 5,000 CY <br />Stockpiling Stockpiling more than  <br />90 days <br />Stockpiling more than  <br />180 days <br />Stockpiling more than  <br />180 days <br />Stockpiling more than  <br />180 days <br />Grading Less than 10 CY or  <br />disturbing less than  <br />1000 sq. ft. <br />Less than 50 CY or  <br />disturbing less than  <br />5,000 sf <br />Less than 50 CY or  <br />disturbing less than  <br />5,000 sf <br />Less than 50 CY or  <br />disturbing less than  <br />5,000 sf <br />Import/ Export Less than 10 CY Less than 50 CY Less than 50 CY Less than 50 CY <br />Stockpiling Less than 14 days or  <br />less than 10 CY <br />Less than 14 days or  <br />less than 10 CY <br />Less than 14 days or  <br />less than 10 CY <br />Less than 14 days or  <br />less than 10 CY <br />Proposed 3‐9‐2020 <br />Unless included as part of a permitted project, a separate Land Alteration permit is required for the following  <br />ACTIVITY <br />Interim Use Permit is required if the following activities are NOT included in a permitted project <br />Location <br />No permit is required for the following activities