My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2020 Council Packet
Orono
>
City Council
>
2020
>
03-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 3:29:35 PM
Creation date
1/12/2022 3:23:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer $50.00 <br />SAC (Sewer Availability Charge) (MCES)$2,485.00 <br />Water $50.00 <br />Horn Quote Basis <br />Connection inspection (Water or Sewer) $100.00 <br />Disconnection inspection (Water or Sewer)$100.00 <br />Connection to existing City Sewer System: $5,380.00 <br />Fee <br />2004 North Long Lake East Extension $16,495.00 <br />2004 West Farm/Homestead $9,900.00 <br />2005‐1 Webber Hills/S Brown Rd Ext $14,990.00 <br />2005‐1 Dickey Lake Dr N $19,125.00 <br />2006‐1 Jamestown Road $15,930.00 <br />2007 Farview Lane Sewer $12,025.00 <br />2010 North Farm Road $20,020.00 <br />2014 Green Trees $21,830.00 <br />2015 Green Trees Extension $20,890.00 <br />Connection to Sewer System in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long <br />Lake Fee Schedule <br />Connection to Wayzata Sewer System $1,000 or per current Wayzata <br />Fee Schedule <br />Connection to existing City Water Main $4,370 per unit <br />*or 20% over adjacent city's fee schedule, whichever is greater of <br />Connection to Wayzata Water System $2,351.00 or per current <br />Wayzata Fee Schedule <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br />Exhibit C Utility Rates and Fees <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with <br />providing water and wastewater utility services to new customers to avoid placing these costs on existing customers. <br />The connection fee includes those portions of existing assets that will benefit new customers together with any <br />anticipated future capital improvements constructed for the purpose of providing utility services to new customers. The <br />connection charge applies to those properties not previously assessed for the associated utility project. <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was <br />assessed) shall pay an amount equivalent to the assessment amount plus interest that residences were charged at <br />the time of the project: <br />Current Fee per Adjacent City <br />$1,900.00 or per current Long <br />Lake Fee Schedule <br />MUNICIPAL CONNECTION PERMIT <br />SEWER PROJECTS <br />WATER CONNECTIONS <br />Fee <br />Connection to Long Lake Water System
The URL can be used to link to this page
Your browser does not support the video tag.