My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2020 Council Packet
Orono
>
City Council
>
2020
>
03-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 3:29:35 PM
Creation date
1/12/2022 3:23:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page | 14 March 9, 2020 <br /> <br />(4) Change the grade or shore of lakeshore property within the shore setback, in excess of 50 463 <br />cubic yards. 464 <br />(5) Stockpiling on site in excess of 500 cubic yards or longer than 180 days, without an 465 <br />associated building permit. 466 <br />(6) Any import/export of material in excess of 500 cumulative cubic yards, also see City Code 467 <br />section 78-1286(d)(3). 468 <br />(57) Conducting grading or land alterations which result in changes in elevations within five 469 <br />feet of adjacent properties, unless part of a building project. 470 <br /> outside of an active building permit. 471 <br /> Emergency repair exception. Slope failures have a direct impact on the health and welfare 472 <br />of Orono residents, and timely response to such events is important to the protection of natural 473 <br />resources and private property. Therefore, the City Engineer may declare grading and/ or export/ 474 <br />import activities in the Lake yard exceeding the limits above as Emergency Repair and forward 475 <br />such application to the City Council for immediate review. Emergency repair shall be defined for 476 <br />the purposes of this Article as the activities necessary to stabilize a failing slope, or prevent the 477 <br />imminent failure of a slope, in the opinion of the City Engineer. 478 <br /> 479 <br />(Ord. No. 219 3rd series, § 6, 12-10-2018) 480 <br />Sec. 78-1746. - Application procedure. 481 <br />The information required and the procedures to be followed for all interim use permit applications 482 <br />shall be the same as that required for a conditional use permit as provided for in this chapter in sections 483 <br />78-912 through 78-917. In addition, the following information shall be provided: 484 <br />(a) Written documentation that includes a complete description of the use, schedule for 485 <br />commencement and termination of the use, hours and dates of operation and anticipated 486 <br />employment. 487 <br />(b) Any special studies requested by the city when there is evidence that the proposed use may 488 <br />negatively impact public infrastructure, the environment or adjacent land uses. These studies may 489 <br />examine the impacts on such things as traffic, environment, wetlands and utilities. 490 <br />(c) Evidence of approval or preliminary approval from all other agencies with jurisdiction over 491 <br />elements of the use. 492 <br /> 493 <br />Formatted: Indent: Left: 0.55", No bullets ornumbering <br />Commented [JB24]: Emergency repair exception <br />Commented [JB25]: Process to review CUP’s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.