My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-2020 Council Packet
Orono
>
City Council
>
2020
>
02-24-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 3:21:07 PM
Creation date
1/12/2022 3:17:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Big Island <br />ADA Trail <br />Project <br />Cost <br />Estimate <br />No.Item Units Qty Unit Price Total Price <br />1 Mobilization LS 1 $ 30,000 $ 30,000 <br />2 Clearing & Grubbing LS 1 $ 8,000 $ 8,000 <br />3 Site Grading LS 1 $ 10,000 $ 10,000 <br />4 Silt Fence/Erosion Control LF 1,000 $ 7 $ 7,000 <br />5 Crushed Limestone Trail LF 4,800 $ 30 $ 144,000 <br />6 Aggregate Base (Class 5)TON 275 $ 80 $ 22,000 <br />7 Granite Boulder EA 12 $ 500 $ 6,000 <br />8 Shade Structure LS 1 $ 80,000 $ 80,000 <br />9 Picnic Table EA 5 $ 3,700 $ 18,500 <br />10 Limestone Block EA 6 $ 600 $ 3,600 <br />11 Removable Bollard EA 2 $ 1,200 $ 2,400 <br />13 Vault Toilet EA 1 $ 75,000 $ 75,000 <br />14 Seeding LS 1 $ 3,500 $ 3,500 <br />Subtotal $ 410,000 <br />10% Contingency $ 41,000 <br />TOTAL Construction $ 451,000 <br />No.Item Units Qty Unit Price Total Price <br />15 Interpretive Sights EA 7 $ 513 $ 3,591 <br />16 Visitor Center interior Painting LS 1 $ 200 $ 200 <br />17 Informational Sign EA 2 $ 513 $ 1,026 <br />TOTAL City Procured and Installed $ 4,817 <br />No.Item Units Qty Unit Price Total Price <br />18 Design LS 1 $ 34,900 $ 34,900 <br />19 Archeology LS 1 $ 15,380 $ 15,380 <br />20 Construction Oversight LS 1 $ 20,000 $ 20,000 <br />TOTAL Design, Management and Admin $ 70,280 <br />Construction <br />estimate. Portion <br />of the project to go <br />out for bid <br />Portion of the <br />project City Staff <br />to complete <br />Contracted design, <br />proj. mgmt. and <br />admin (eligibility for <br />grant capped at <br />10%)PROJECT TOTAL $ 526,097
The URL can be used to link to this page
Your browser does not support the video tag.