Laserfiche WebLink
Prepared By: Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action is to get initial City Council feedback and direction on a proposal <br />from the Long Lake Rowing Crew to partner with the City to construct and maintain a boat house and <br />docks at Summit Beach Park. <br /> <br />2. Background. <br />a. Long Lake Rowing Crew (LLRC). The LLRC was founded in 2014 for the sport of rowing on <br />Long Lake. LLRC is a non-profit, 501C# organization. The mission of Long Lake Rowing Crew is "to <br />provide a safe, inspiring and educational opportunity for people of all ages to learn, enjoy and excel in <br />the sport of rowing. LLRC is a volunteer-driven, non-profit club committed to knowledgeable instruction, <br />personal and competitive achievement, and the well-being of its members and the greater Long Lake <br />community." (Club information at http://longlakerowing.org/) LLRC has been operating out of the <br />Birches site and the Long Lake Fire Department. However the Birches site is not ideally suited to <br />launching boats and the club is looking for a place to construct a boathouse. The club approached the <br />City in 2018 about the possibility of partnering with the city for use of the Summit Beach Park location. <br />. <br /> <br />b. Summit Beach Park. The park is located at 455 East Long Lake Road and consists of a small <br />beach area, a gravel parking area, a wooded picnic area with tables, a canoe launch, a porta-potty with <br />surround. The park is 4.56 acres with the majority of the land dominated by a ravine and wetland. The <br />property was donated to the city in the 1970s. The ravine area was stabilized as part of a stormwater <br />project in 2018-19. The park will serve as the southern trail head for the recently approved East Long <br />Lake Trial project. <br /> <br />c. Actions to Date. The Parks commission considered this proposal at the November 4th, 2019 Park <br />Commission meeting at which time the Commission tabled the action (Minutes at Exhibit B). The Parks <br />Commission considered the proposal again at their March 2nd, 2020 meeting. The Park Commission was <br />asked to consider the following: Does the proposal enhance or detract from the use of the park; what <br />benefits would the proposal provide to the park; to the community; what costs if any would be incurred <br />by the city; what requirements (accessibility to public, park improvements, public programs) does the <br />commission recommend the City council consider imposing on the applicants plan; what restrictions (size <br />of structures, location of structures, hours of use, parking) does the commission recommend the City <br />council consider imposing on the applicants plan. After much deliberation the Commission moved and <br />voted to move the proposal to the City Council for review with the guidance that there needs to be a <br />master plan created before there is any decision as to whether the rowing club is part of the park or not, <br />it needs to involve a broader set of community input, and the Park Commission should have a role in that. <br />VOTE: Ayes 6, Nays 0, Abstain 1. (Minutes at Exhibit C) Public comments were received at both <br />Commission meetings. <br /> <br />3. Proposal. LLRCs proposed improvements at Summit Beach Park would include a boathouse, public <br />restrooms and 2 docks (one for safety boats and one to launch boats) east of the beach. <br /> <br />4. Public Comment. At the November 4th, 2019 meeting the Park Commission received public <br />comment. The minutes of that meeting including the public comment are at exhibit B. Written public <br />comments received after the meeting are at exhibit C. At the March 2nd, 2020 meeting addition public <br />Item No.: 9 Date: July 27, 2020 <br />Item Description: Long Lake Rowing Crew Proposal for a Boat House in Summit <br />Beach Park-Initial Council Input / Guidance <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Public Works / <br />Engineering