My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Anderst - SAC Issue
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3384 Shoreline Drive - Narrows
>
Permits/Inspections
>
Anderst - SAC Issue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
12/13/2021 1:47:34 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The transfer is limited to those Sites for which the Community remitted SAC to MCES. <br /> Transfers will not be allowed for Non-Conforming Uses <br /> • The transfer request is not for the benefit of a residential or industrial SAC Determination <br /> • A minimal SAC demand for the Site must be retained(as appropriate for the type of property <br /> (retail, office, and/or warehouse). A minimum of 1 SAC unit for all stand-alone buildings <br /> must be retained at the Site from which SAC is being transferred <br /> • The transfer may receive provisional approval from MCES such that the business can <br /> continue operating on the old Site while the new Site is being built out(has gotten a building <br /> permit and has received the benefit of the transferred SAC Credits). However,the certificate <br /> of occupancy on the new space will trigger SAC due if the transferred SAC from the old <br /> space is continuing to demand wastewater capacity <br /> 5.8 Community SAC Reviews <br /> 5.8.1 Basis for Community SAC Reviews <br /> MCES will review each Community's records at least once every three years to assure conformance <br /> and consistency to its SAC rules and procedures. <br /> 5.8.2 Records Reviewed <br /> During each review,MCES will only look at the most recent 3 years of building or permit or license <br /> activity including,but not limited to: <br /> • New Residential permits <br /> • Residential addition permits that increase the number of Dwelling Units <br /> • New Commercial permits <br /> • Commercial remodel,addition,tenant finish,and build out permits <br /> • Business licenses that change the use of the space <br /> • Federal construction sewer connections <br /> • Demolition permits <br /> MCES will also review the SAC reports during the review period and verify that the 1%prompt <br /> payment discount has been taken correctly. <br /> 5.8.3 Community Review Payments and Reporting <br /> 5.8.3.1 Past Due SAC <br /> When unremitted SAC charges from prior years are discovered during a Community Review or <br /> otherwise,the Community must respond in writing within 60 days from the date of the MCES letter <br /> if the Community can provide additional information or has a dispute with any of the findings to <br /> preserve the Community's legal rights.All undisputed portions of the findings must be paid within <br /> 60 days. In an extraordinary situation,the Community may request more time via a written appeal to <br /> the MCES Finance Director. <br /> Note: The liability for unpaid SAC is the Community's responsibility regardless of collection of SAC <br /> from property or business owners. <br /> 5.8.3.2 Good Faith Efforts and Use of Earlier SAC Rate <br /> Where the Community has acted in Good Faith in the opinion of the MCES Finance Director,MCES <br /> may accept a payment based on an earlier SAC rate and/or without interest accrual.The earlier SAC <br /> rate is that rate that was in effect at the time the SAC should have been submitted to MCES. <br /> Acceptance of the earlier rate is contingent on payment within 60 days from the date of the <br /> Page41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.