My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCWD erosion conrl permit
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
3382 Bayside Road - 05-117-23-14-0069
>
Permits/Inspections
>
MCWD erosion conrl permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:19:04 PM
Creation date
8/18/2015 12:08:03 PM
Metadata
Fields
Template:
x Address Old
House Number
3382
Street Name
Bayside
Street Type
Road
Address
3382 Bayside Rd
Document Type
Permits/Inspections
PIN
0511723140069
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� MINNEHAHA CREEK WATERSHED DISTRICT <br /> QUALITY OF WATER QUALITY OF LIFE <br /> $ITE MEETING SUMMARY <br /> DATE: May 2, 2011 <br /> TO: John Sonnek <br /> FROM: Joe Barten, District Representative <br /> RE: MCWD Permit 10-285: 3382 Bayside Road,Orono <br /> This letter serves as a summary of a meeting regarding 3382 Bayside Road in Orono on April 27, 2011. This <br /> meeting was attended by John Sonnek, Luke Schwitzer, and Joe Barten. The following issues were discussed: <br /> • Addition of plastic poly as Erosion Control around the creek as well as newly installed silt fence is <br /> sufficient to temporarily prevent erosion into the creek in that area of the site <br /> • Additional rock added to west construction entrance is satisfactory to prevent off site tracking <br /> • Permanent stabilization (wetland buffer seed and erosion control blanket) of the creek banks will be <br /> performed as soon as possible, and erosion control measures will be implemented during and after work <br /> around the creek <br /> • Temporary or permanent site stabilization will be performed as soon as possible <br /> • Furthermore,we discussed the details of the streambank stabilization to include approximately 2 rows <br /> of stacked boulders(roughly 36 inch)with a final grade at the top of the riprap to be feathered back and <br /> permanently stabilized with vegetation. <br /> Thank you for your attention to MCWD permit requirements. If you have any questions, please contact me at <br /> (952) 641-4518 or by email at jbarten@minnehahacreek.org <br /> Sincerely, <br /> ��� <br /> � <br /> Joe Barten <br /> District Representative <br /> Cc: Luke Schwitzer, Minnehaha Creek Watershed District <br /> Melanie Curtis, City of Orono <br />
The URL can be used to link to this page
Your browser does not support the video tag.