Laserfiche WebLink
CITY OF ORONO <br />RFSOLUTIO [ i{ 1 ! 1F UTY COUNCH <br />NO 7042 <br />• A Variance to Orono Municipal Zoning Code Section 78-1405 for a structural coverage <br />variance to allow 26.9% buildinglstructural coverage; <br />• Variances to Orono Municipal Zoning Code Sections 78-350: 78-1279; and 78-1405 for <br />setback variances to allow: <br />2.103 square feet of building/structure within the 75 -foot setback where no structure is <br />allowed; <br />Retaining walls within the 75 -foot setback. 32 feet from the OHW L, <br />- Retaining walls within 10 -feet of the paved roadway, 2 feet from the paved road; <br />Retaining walls in excess of 2 feet in height within the side yard setback; <br />6.3 -foot rear yard setback variance for the principal building where 30 -foot setback is <br />required,- <br />- <br />equired;- 41 -foot setback from the OHWL for the principal building where a 75 -foot setback is <br />required; <br />- Driveway width within the 75 -foot setback wider than the permitted 8 -foot allowance; <br />and <br />• An IUP pursuant to Section 78-1726 for removal of approximately 1,120 cubic yards of fill from <br />the 75 -foot setback, subject to the following conditions - <br />1 Council approval is based on the entire record, above Findings. <br />2. The approved project shall conform to the hardcover calculations and improvements as <br />shown on the revised site plan dated 10/18/19 submitted by the Applicants and annotated <br />by City staff, attached to this Resolution as Exhibits A and B. <br />3. Any amendments to the plans which are not in conformity with City codes may require <br />further Planning Commission and City Council review. <br />4. No grading within the Hennepin County Regional Rail Authority's (HCRAA) easement is <br />permitted without HCRR permit 1 permission. <br />5. To offset the hardcover increases. the plan proposes underground infiltration (French <br />drains). Applicant shall provide the calculations used to size the system with the <br />Building Permit submittal. Also a detail of the French drain should be included in the <br />plan set, and the locations shown on the as -built certificate of survey. <br />6. A complete stormwater pollution prevention plan shall be required as part of the building <br />permit review. <br />9 <br />