My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2021 Council Packet
Orono
>
City Council
>
2021
>
10-25-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 7:55:59 AM
Creation date
11/9/2021 7:52:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared By: Reviewed By: A. Carlson Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to close out the contract for the Tonkawa Phase II <br />Forcemain Replacement Project (21-021) <br /> <br />2. Background. On November 23rd, 2020 Council approved the design and engineering of the Tonkawa <br />Phase II Forcemain Replacement project. On March 8th, 2021 Council awarded the project to GM <br />Contracting. The work was completed in June. However, during construction we discovered the <br />forcemain was not in the location identified on the recorded drawings. As a result the contractor had to <br />spend a considerable amount of labor and equipment time to locate them. Once located the method of <br />replacement had to be changed to avoid potential damage to other infrastructure in the right of way. On <br />August 23rd Council approved change order #1. The project is now complete and all of the close out <br />paperwork has been received. <br /> <br />3. Project Scope of Work. The projects consisted of replacement of 1,105 feet of 6 inch forcemain that <br />leads from Lift Station #28 on Park Lane to the end of the Phase I project on Tonkawa Road. <br /> <br />4. Cost. The final pay request is for $13,087.42. The total contract cost will be $261,748. <br /> <br />5. Funding. Funding for the project comes from the Sewer Fund. <br />Fund CIP Amount Est. 2021 End of Year Fund <br />Balance <br />Sewer Funds $ 298,509.84 $ 1,600,053 <br /> <br />6. Staff Recommendation. I recommend approval of the final pay request and project close out. <br /> <br />COUNCIL ACTION REQUESTED <br />Move to approve payment of $13,087.42 to GM Contracting and close out of the Tonkawa Forcemain <br />PH2 Project. <br /> <br />Reference <br />A. Final pay request. <br /> <br /> <br /> <br />Item No.: 6 Date: October 24, 2021 <br />Item Description: Tonkawa Phase II Forcemain Replacement – Close out <br />Presenter: Adam Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.