Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. ________________________ <br />8 <br />3) Building design and floorplans shall be generally consistent with the examples <br />included in the attached Exhibit A-11 thru A15. <br />4) Flexibility shall being granted for the building roof design and hardcover as noted <br />in the Findings section above. <br />5) Applicant to confirm with SHPO that there are no archaeological sites within the <br />property. <br />6) The Developer shall install stormwater management facilities generally as shown <br />on the various attached plans. Developer shall provide suitable evidence of <br />Minnehaha Creek Watershed District (MCWD) approval of the stormwater <br />management plan before Development Plan and Final Plat Approval will be <br />granted. The Developer shall provide sufficient drainage and utility easements as <br />necessary to allow for future City maintenance access for stormwater management <br />facilities. <br />7)Grading, Erosion Control <br />a) Erosion control shall adhere to "Best Management Practices for Protecting <br />Water Quality in Urban Areas" and to the approved SWPPP. All erosion controls <br />as required by the City and the MCWD shall be in place prior to commencing <br />excavation on the site. All such erosion control measures shall be maintained in <br />working order until the site is revegetated. <br />b) The construction limits shall be clearly marked with adequate fencing to <br />prevent any construction damage or disturbance of any trees and vegetation outside <br />of the construction limits area. <br />8) City Engineer and Fire Department approval. <br />a)Proposed plans shall be provided to the City for final review and approval <br />with the Final Plan set. The Public Works Department, Fire Department and any <br />other pertinent reviewing agencies shall review and approve all utility <br />improvements. Final sanitary sewer and watermain plans shall be provided and are <br />subject to approval by the Public Works Department and City Engineer. <br />b) Any additional plans and specifications deemed necessary by the City as <br />review progresses.