My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-2021 Council Packet
Orono
>
City Council
>
1950-2024
>
2021
>
08-09-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 7:41:50 AM
Creation date
11/9/2021 7:34:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Document1 <br /> <br />August 4, 2021 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br /> <br />RE: Public Works Sanitary Sewer and Watermain Extension <br /> <br />Dear Mr. Edwards: <br /> <br />As requested, we have prepared a scope of services and estimated fee for the construction services <br />associated with the Public Works Sanitary Sewer and Watermain Extension project. <br /> <br />Scope of Services <br /> <br />Construction Staking and Observation <br />Construction staking will be provided along with 75% construction observation. Duties of the <br />Construction Observer will include the following: <br />• Attendance at the pre-construction meeting and all construction-related meetings <br />• Serve as a liaison between the City and the contractor <br />• Review of the completed work to determine if the project is in general conformance with the <br />plans and specifications <br />• Review of all materials testing <br />• Maintenance of construction documentation <br />• Communication with affected property owners, as necessary, to address their construction-related <br />concerns and issues <br /> <br />Construction Administration <br />Construction administration duties will include the following: <br />• Administering a pre-construction meeting <br />• Review of shop drawings <br />• Preparation of pay estimates <br />• Contractor Communications <br />• Liaison with City Staff and Council <br /> <br />Record drawings detailing the completed improvements as recorded by the construction observer and the <br />City of Orono’s contractor will be completed and furnished to the City in hard copy and electronic format. <br />Record plans will also be linked to the City mapping system and the City’s GIS system will be updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.