My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2021 Council Packet
Orono
>
City Council
>
2021
>
06-28-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 7:33:58 AM
Creation date
11/9/2021 7:26:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Generic GO Bond Proceeds 25 Ver – 10/26/2020 <br />Grant Agreement for Construction Grants <br /> <br />Formula #1 <br />Cumulative Advances < (G.O. Grant) × (percentage of matching funds, if any, required under <br />Section 7.23 that have been disbursed) <br /> <br />Formula #2 <br />Cumulative Advances < (G.O. Grant) × (percentage of Project completed) <br /> <br />Section 6.02 Draw Requisitions. Whenever the Public Entity desires a disbursement of a <br />portion of the G.O. Grant, which shall be no more often than once each calendar month, the Public <br />Entity shall submit to the State Entity a Draw Requisition duly executed on behalf of the Public Entity <br />or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day <br />of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before <br />the date the Advance is desired. Each Draw Requisition with respect to construction items shall be <br />limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion <br />as approved by the Public Entity and the State Entity, plus (ii) the value of materials and equipment <br />not incorporated in the Project but delivered and suitably stored on or off the Real Property in a <br />manner acceptable to the State Entity, less (iii) any applicable retainage, and less (iv) all prior <br />Advances. <br /> <br />Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the <br />Real Property will be made by the State Entity unless the Public Entity shall advise the State Entity, <br />in writing, of its intention to so store materials prior to their delivery and the State Entity has not <br />objected thereto. <br /> <br />At the time of submission of each Draw Requisition, other than the final Draw Requisition, the <br />Public Entity shall submit to the State Entity such supporting evidence as may be requested by the <br />State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition <br />or to substantiate all payments then made with respect to the Project. <br /> <br />At the time of submission of the final Draw Requisition which shall not be submitted before <br />completion of the Project, including all landscape requirements and off-site utilities and streets <br />needed for access to the Real Property and, if applicable, Facility and correction of material defects <br />in workmanship or materials (other than the completion of punch list items) as provided in the <br />Construction Contract Documents, the Public Entity shall submit to the State Entity: (i) such <br />supporting evidence as may be requested by the State Entity to substantiate all payments which are <br />to be made out of the final Draw Requisition or to substantiate all payments then made with respect <br />to the Project, and (ii) satisfactory evidence that all work requiring inspection by municipal or other <br />governmental authorities having jurisdiction has been duly inspected and approved by such <br />authorities, and that all requisite certificates of occupancy and other approvals have been issued. <br /> <br />If on the date an Advance is desired the Public Entity has complied with all requirements of this <br />Agreement and the State Entity approves the relevant Draw Requisition and receives a current <br />construction report from the Inspecting Engineer recommending payment, then the State Entity shall <br />disburse the amount of the requested Advance to the Public Entity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.