Laserfiche WebLink
Project #2‐ Enclosing Rest Station (Wells House)  <br />Currently our rest station services golfers twice throughout the golf round of 18 holes.  It  <br />consists of two bathrooms, and a self‐service area for beverages and snacks.  Bathrooms are  <br />currently accessed from the outside of the building which makes it difficult to keep them clean  <br />and sanitary as it is a stand‐alone building surrounded by trees and naturalized area.  The  <br />current building is not tempered space and is showing its age of 23 years.  <br />It is our desire to renovate the rest station so as to make the bathrooms accessible from the  <br />inside only for better cleanliness and provide a tempered environment for the golfers.  There  <br />will also be an addition of some refrigeration for prepackaged food to be available to the  <br />golfers.  However, our service model will not change nor the amount of golfers accessing the  <br />building on any given day.  <br />We have discussed our ideas with the Allison Rude from Hennepin County Department of  <br />Health and incorporated her suggestions and requirements into our construction specifications.  <br />  <br />Projects #3‐ Cold Storage Addition   <br />It is Spring Hill’s plan to remove the on‐site house and two garages that are currently used for  <br />storage of golf course accessories.  The buildings were preserved when the golf course was  <br />constructed for employee housing and storage.  All buildings are in poor condition so we plan  <br />to demolish the structures and remove the asphalt parking lot so we can turn the area into  <br />open green space.  <br />In an effort to replace the storage space, our plan is to construct a small, post frame building to  <br />store seasonal golf course accessories.  This will include benches, water coolers, trash  <br />containers, rakes, turf covers, etc.  The building will be placed in an area that will be hidden  <br />from the bordering roads, much like the existing maintenance buildings.  No trees or understory  <br />brush will be removed to install the new storage building.  Our plan is to have power to the  <br />building for interior lights, garage door opener, and outlets for miscellaneous hand equipment  <br />when needed.  <br />