My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-2021 Council Packet
Orono
>
City Council
>
2021
>
05-10-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2021 4:48:47 PM
Creation date
11/8/2021 4:38:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement No. PW 05-08-19 <br /> CSAH No. 15 & 19; C.P. 2151000 <br />6 ___ <br /> <br /> Green Bicycle Conflict Zone Markings. Not applicable to the Project. <br /> <br /> Storm Sewers. After the completion of the Project, the City shall own and bear <br />maintenance responsibilities for all components of the roadway storm sewer drainage <br />system within the City right of way, and those items not in the County right of way, <br />property or easement constructed as a part of, or connection to this Project. The City <br />shall provide maintenance assistance to the County upon request for routine or <br />emergency maintenance of the stormwater system such as flushing and clearing <br />obstructions. The maintenance cost for those drainage systems serving both the City’s <br />and County’s impervious surfaces shall be calculated based on percentage of run off <br />from each party’s impervious surfaces. <br /> <br /> Landscaping. The City affirms that any landscaping and streetscape to be constructed <br />by the City or its agents within the right of way of CSAH 15 and CSAH 19 shall be <br />constructed and maintained in accordance with the attached Exhibit B (Hennepin <br />County Department of Public Works – Transportation Division: Recommended Urban <br />Landscape/Streetscape Guidelines). <br /> <br />8. The County’s Maintenance Responsibilities. Upon completion of the Project, the County <br />shall provide year-round maintenance at its sole cost as outlined below: <br /> <br /> Roadways. Maintenance of CSAH 15 and CSAH 19 reconstructed under the Project. <br />Maintenance includes, but is not limited to, sweeping, debris removal, resurfacing and <br />seal coating, and any other maintenance activities according to accepted County <br />maintenance practices. <br /> <br /> Traffic Signal Components. The County shall thereafter retain ownership of and be <br />responsible for the routine maintenance and repair of the traffic control signal systems <br />and their components including EVP, signal communications and interconnect at the <br />expense of the County except for those items identified as City’s responsibilities above. <br /> <br /> County Road Pavement Stripping. The County shall thereafter maintain and repair <br />all pavement striping for roadway users installed as a part of the Project. <br /> <br /> Storm Sewers. Upon completion of the Project, the County shall retain ownership of <br />and maintenance responsibilities for those portions of the roadway storm sewer drainage <br />system within the County right of way. <br /> <br />9. Authorized Representatives. In order to coordinate the services of the County with the <br />activities of the City and vice versa so as to accomplish the purposes of this Agreement, the <br />Hennepin County and the City Engineers or their designated representatives shall manage this <br />Agreement on behalf of the County and the City. <br /> <br /> County of Hennepin: <br /> Carla Stueve <br /> County Highway Engineer <br /> Hennepin County Public Works <br /> 1600 Prairie Drive, Medina, MN 55340
The URL can be used to link to this page
Your browser does not support the video tag.