Laserfiche WebLink
Agreement No. PW 05-08-19 <br /> County Project No. 2151000 <br /> County State Aid Highway 15 & 19 <br /> City of Orono <br /> County of Hennepin <br /> <br />1 ___ <br /> <br /> <br /> <br />COOPERATIVE AGREEMENT <br /> <br /> <br /> <br />This Agreement is made between the County of Hennepin, a body politic and corporate under <br />the laws of the State of Minnesota, hereinafter referred to as the “County”, and the City of Orono, <br />a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the <br />“City”. The County and the City collectively are referred to as the “Parties”. <br /> <br /> <br />Recitals <br /> <br /> <br />The following Recitals are incorporated into this Agreement. <br /> <br />1. The County and the City have been negotiating to bring about safety, roadway and pedestrian <br />improvements to an intersection of County State Aid Highway (CSAH) 15 (Shoreline Drive) <br />at CSAH 19 (Shadywood Road) in the City of Orono. The improvements include the following <br />and shall hereinafter be referred to as the “Project”: <br />• Removal of a channelized right-turn island to reduce turning speeds, <br />• Replacement of a traffic signal, <br />• Installation of flashing yellow arrows for left-turning vehicles, <br />• Installation of Accessible Pedestrian Signals (APS) and Americans with Disabilities <br />Act (ADA) upgrades to pedestrian ramps, <br />• Replacement curbs, gutters, underground utility lines, and pavement substructure, <br />• Restriping crosswalk and pavements, <br />• Constructing new sidewalks, bituminous surfacing, grading, drainage, and other <br />improvements as shown under County Project (CP) No. 2151000. <br /> <br />2. The Parties have agreed to enter into this Agreement to memorialize the partnership and to <br />outline each party’s financial, ownership, and maintenance responsibilities, and associated <br />costs for the Project. <br /> <br />3. The County shall be the lead agency in Project design, engineering, and construction <br />administration, and be responsible for acquiring all necessary right of way and/or other <br />governmental agencies-required permits needed for the Project. <br /> <br />4. The Project will be carried out by the Parties under the provisions of Minnesota Statutes, <br />Section 162.17, Subdivision 1, and Section 471.59. <br /> <br /> <br />