Laserfiche WebLink
7. MOUND DIMENSIONS <br />Comments: <br />Mound berms calculated at 3:1 slope ratio. The Downslope berm cannot extend beyond property boundary. <br />Due to the the height of the mound and 12% slope, additional landscaping may be necessary to keep backfill <br />and topsoil on property. <br />Project ID: <br />To <br />t <br />a <br />l <br /> <br />M <br />o <br />u <br />n <br />d <br /> <br />W <br />i <br />d <br />t <br />h <br />Upslope <br />Downslope <br />Cl <br />e <br />a <br />n <br /> <br /> <br /> <br /> <br />S <br />a <br />n <br />d <br />Clean Sand <br />Endslope EndslopeDispersal Bed: <br />X <br />Total Mound Length