Laserfiche WebLink
IN <br />8 <br />WELL setbacks: 20' to pressure tested sewer line (5 psi for 15 min) <br />50' to everything 100' to dispersal area with shallow well <br />PROPERTY LINES setback: 10' to everything <br />Road setback: platted: 10' prop line. Metes Et bounds: out or road easement, or outer ditch. <br />LADE I BLUFF setback: 20' for bluff. Lakes: GD _, RD _, NE Protected wetland _. <br />Building setbacks: 10' for everything, 20' for dispersal area. <br />WATERLINE under pressure se 10' to bed, tank Et sewer line. (else sewer line ?12" below) <br />Sewer line Et baffle connection (no 90's, T between 45's, slope min 1" in 8', max 2" in 8') <br />(no depth reqs, clean out every 100', Sch 40 pipe) <br />Septic tank and risers (water tight, insulated, proper depth, existing verified by pumping) <br />mfg 2250 gallons none <br />Riser over outlet, riser over inlet or center, and 6"+ inspection pipe over any remaining baffles. <br />No effluent filter Et alarm <br />Dose tank risers and piping (water tight, insulated, proper depth, drainback) <br />Mfg 12501 gallons <br />dose pump 31 gpm 21 head VERIFY PUMP CURVE 6.6 min ON 9 hr OFF <br />float setting drop 8.2 inches with 25.0 gpi "DESIGNED" 5.1 inches approx float tether ler <br />206 gal dose divided by gpi "INSTALLED" = inches float drop (field corrected) <br />LABEL pump requirements and drawdown on riser or panel <br />Cam lock reachable from grade - 30" max. J -hook weep hole. Supply line access (no hard 90's) <br />2.0 inch supply pipe: Sch40, sloped 1/8"+, supported by 4" sch40 sleeve or compacted, and buried 6"+. <br />splice box / control panel / electrical connections <br />flow measurement: CT, ETM, time dosing, home water meter <br />rock dimensions 6.9 X 108.0 (down from pipe) <br />Bermed topsoil beyond pipe <br />cover depth of 12-18"+ <br />2 lateral(s) <br />2.00 inch pipe size <br />7132 inch perforations <br />2.0 ft perforation spacing <br />5 upslope 12 downslope <br />VERIFY <br />(Sch 40 pipe and fittings) <br />Air inlet at end of laterals, and at top feed manifold if necessary. VERIFY <br />clean outs (no hard 90's) <br />4" inspection pipe to bottom of rock, anchored (near lateral pipe) VERIFY <br />Abandon existing system - if necessary <br />monitoring plan and type <br />well abandonment form - if necessary <br />�Re-use existing tank certification <br />Y'e1 <br />