Laserfiche WebLink
M <br />3) <br />0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.7 <br />percent site slope (0-20% range) 12 (% downslope site slope, if different than upslope) <br />16 inches, or 1.3 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains=inches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />20 inch, or 1.7 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br />27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />17.0 ft. Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 12 ft. upslope berm <br />4;1 sideslope 16 ft. sideslope berms <br />4:1 downslope 26 ft. downslope berm <br />Overall Dimensions: <br />berm <br />L411iting Condi <br />10.0 ft. wide by 63.0 ft. long Rock bed <br />4$ 1 ft. wide by 1 95 1 ft. long Mound footprint <br />4" inspection pipe <br />e-- 18" cover on top <br />12 <br />1 Clean sand lift <br />L1 33 Depth to Limiting, <br />r� '� — ---------- _—_ <br />AbsorQtion Width <br />Downslove berm F261 <br />12" cover on sides <br />(6" loamy cap &:6" topsoil) <br />Note: <br />For Q to 1% slopes, Absorption WIdth is measured from the Bedequally in Fath directions. <br />For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br />Rock Bed: <br />10.0 ft. by F —63—.70.ft. by inches under pipe, plus 20% gives =yd" or *1.4= 29 ton <br />Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />38.2 up + 124.2 downslope + 14.9 ends + 44.7 under rock =266 yd-' or "1.4= 373 ton <br />plus 20% <br />Loamy Cap: <br />44 ft. by 91 ft. 6" deep, plus 20% gives <br />36) Topsoil: <br />89 yd' or *1.4= 125 ton <br />48 ft. by 95 ft. 6" deep, plus 20% gives =yd-' or *1.4= 143 ton <br />I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br />Rusty Olson's Soil iz Perc 810 10/10/2021 <br />finer Signature Company License# Date <br />