Laserfiche WebLink
Installer Summary <br />2250 gallon Septic tank (minimum) Tank options: none <br />W70 targer LanK wiin rnutuipte comp/ tanKs <br />1250 gallon Dose tank (minimum) at 25,48 gpi <br />29 JGPM @ 14 ft. of head, Pump required <br />6.0 inch swing on Demand float which translates to roughly =inches of float tether length <br />Optional Time dosing of: <br />18 inches from bottom of tank to "pump ON" float, orM <br />hours OFF <br />21 inches from bottom of tank to "Hi Level Alarm" or inches to "timer ON" float <br />inches to "Hi level" float <br />15 ft. of 2.0 inch supply line with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />24 inch, or 2.0 ft. Sand Lift Mound <br />10.0 ft. wide by 50.0 ft. long Rock bed <br />3 laterals 2.00 inch diameter 48.0 ft. long 3.0 ft. lateral spacing <br />7/32 inch perfs 3.0 ft. perforation spacing <br />No JEffluent filter Et alarm <br />3 clean out Et valve box assemblies <br />20.0 ft.Total sand ABSORPTION width (minimum) <br />0.0 ft. upslope and sideslope (sand beyond rockbed, minimum) <br />10.0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 10 ft. upslope berm <br />3:1 sideslope 17 ft. sideslope berms <br />4:1 downslope 1 34 ft. downslope berm <br />4" inspection pipe <br />18" cover on top <br />berm 10 .I 1� L, Downstope berm 34 <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />2.0 11 Clean sand lift <br />_ <br />Depth to Limiting <br />__ng Co1.0 <br />Limitindition _ — ---�_ --d _a __ <br />Absorption Width 20.0 — —_— _ �----__---_—_ <br />Neste: <br />For 0 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1 , Absorption Width is measured downhill from the upslope edge of the Bed. <br />Rock Bed: 17.0 yd3 or *1.4= 24 ton <br />Mound Sand: 340 yd or *1.4= 475 ton <br />Loamy Cap: 89 yd or *1.4= 125 ton <br />Topsoil: 101 yd or *1.4= 141 ton <br />INSPECTOR CHECKLIST <br />6 inches under pipe <br />calculation based on 3:1 /4:1 slope from top of rockbe <br />6" deep <br />6" deep <br />- mound <br />