My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-2021 septic design
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
3360 Watertown Road - 32-118-23-44-0005
>
Septic
>
08-09-2021 septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:42:22 PM
Creation date
10/20/2021 1:05:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3360
Street Name
Watertown
Street Type
Road
Address
3360 Watertown Road
Document Type
Septic
PIN
3211823440005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN FOR AN SUBSURFACE SEWAGE TREATMENT <br />SYSTEM (SSTS) <br />PREPARED BY: <br />CHB'S SEPTIC SERVICE LLC. <br />Pence! "Chip- Rentgn <br />16762 Babcock Ave. <br />Lester Pnlriq MN 55354 <br />95L20041176 <br />ch'osevncn mell_com <br />Minnesota Pollution Control Agency Individual Sewage <br />Treatment System License No. 20M <br />For: <br />David Williams <br />Olson Construction <br />Ron Olson <br />952-448-6674 <br />Caution of proposed septic system site: <br />PIUP 3211823440005 <br />3360 Watertown Road <br />Orono, MN 55356 <br />This site will be designed for an Above Grade Drain field <br />The site must remain protected until construction begins. <br />(This is the responsibility of the owner and or General Contractor) <br />This site evaluation was completed on August 20, 2020. It is for a Type 3 dwelling with <br />and es8mated Row of450 gallons per day. Soils infornadon indicated filled and mixed <br />axils. This system will be considered An Other System, and a Monitoring and <br />MRigation plan will need to be developed and signed by the homeowner. An above <br />grade drainfield will be used to meet the 3 -foot separation from the seasonal high <br />watmable as required by MPCA Agency Rules and Standards. Chapter 7080,81. <br />The Mound Systemdesignmuis42feetwidewtalengthof62fw. Pin Flagshave <br />marked the location of the soil borings, plus the boundary of the rockbed. <br />The proposed system will require (1) 2000 -gallon pre -cast split compartment septic tank, <br />and (1)1000 gallon protest Pumptmtk Thepump will need to be sizedmdeliver 29 <br />gdlons per minute with a lift of 26 feet of tocol head. <br />
The URL can be used to link to this page
Your browser does not support the video tag.