Laserfiche WebLink
0 Sewer and Water Connection Charges. No sewer and water connection charge <br /> is due for the Office site. However, the amount of the S&W connection charge <br /> attributable to the Senior Housing site (which amount will be deferred) is arrived <br /> at by use of the following formula: <br /> (A+B) - 41 x 6.7 acres x $13,545/acre = Connection Charge Due <br /> (A+B) <br /> where: A=number of senior housing dwelling units= 62 <br /> B =number of SAC units required for office building <br /> 41 =number of sewer/water units paid previously <br /> If the Office building requires 12 SAC units,then the amount to be deferred <br /> for the Senior Housing is: <br /> [(62+12)-41]/(62+12)= 33/74= 0.446 x 6.7 x $13,545 = $40,475 <br /> If the office building requires 10 SAC units, then the amount to be deferred for the <br /> Senior Housing is: <br /> [(62+10)-41]/(62+10)= 31/72 = 0.431 x 6.7 x$13,545 = $39,114 <br />