Laserfiche WebLink
mom <br /> Frank Dunbar Senior Housing Proposal-Site Plan Issues <br /> February 16, 2001 <br /> Page 3 <br /> 2. Options. <br /> a. Require a separate access road from the office building to Brown Road and direct the <br /> developer to find a way to lay out the access road in a way that does not require a <br /> substantial retaining wall that would be visible from Brown Road and Highway 12. <br /> b. Route the traffic from the office building through the parking lot of the senior <br /> housing building. <br /> c. Route the office building traffic through the parking lot of the senior housing <br /> building,but also plan to make the connection from the office building to an access <br /> road that connects to Highway 12 at Brimhall or that connects to Willow Drive. <br /> d. Require all office building traffic to use only the right-in/right-out access and make <br /> U-turns at Brown Road, Willow Drive, or other intersection along Highway 12 to <br /> enter from the west or to exit to the east. <br /> Staff will work with the City's traffic engineer and the developer to analyze the various options in <br /> more depth prior to the February 22 work session. We have also requested the developer to provide <br /> revised site plans by Tuesday, February 20 so that the Council can review them prior to the work <br /> session. <br />