|
Sep-06-02 08: 55A P_03
<br /> y} Oh 4 we ►t .
<br /> i .r , 4 `f,-e hC[r/f 146iirGe tre„ CGe ',etc 1Q / 07c C .1.4,,•r, SU1
<br /> CITY OF ORONO
<br /> ORONO WOODS APARTMENTS
<br /> COMMERCIAL SITE DEVELOPMENT
<br /> PLAT FILE NO. 2641
<br /> - P
<br /> SITE IMPROVEMENT COST ESTIMATE: PHASE.-UTILITIES AND STREET
<br /> • .E.:c;::i}w witiYE '.:', ;, V .•'.1':.•ww.s :Hnq.11.1. :n.:.w.0 . o.•>yn,vranX
<br /> ^.•wiFv .....:.rn:::.r•:.:J:.':.. •:n '�v
<br /> ' qvLw.w •:......fin: ..:....:....::.:.:.:.::: •..<n•.
<br /> EST. UNIT r N...
<br /> EST.
<br /> ITEM UNIT QUANTITY PRICE COST
<br /> Stabilization fabric SY 4000 1.00 00�`'
<br /> Aggregate base, Cl. 4, 100% crushed TN 1900 11.00 20,900 /
<br /> Aggregate base, Cl. 5, 100% crushed TN 1900 11.00 20,900
<br /> Type 31 bit. base course TN 600 32.00 19 200✓
<br /> Type 41 bit. wear course TN 300 35.00 4.1110141.
<br /> Bituminous material for tack GL 400 1.00 •00
<br /> Concrete curb and gutter LF 1910 8.00 5 280`./.
<br /> Landscaping LS 0.75 40,000.004,000 ='
<br /> Concrete walk SF 3000 3.00 ( •,i s0
<br /> 6” DIP LF 160 20.00 , - •a
<br /> 8" DIP LF 980 25.00 24,500 } '
<br /> DIP fittings LB 3000 1.00 3,000
<br /> 6" gate valve & box EA 5 800.00 4,000
<br /> i 8" ate valve &
<br /> 9 box
<br /> EA 3
<br /> 1,000.00 3,000--
<br /> Hydrant EA 1,500.00
<br /> Connect to existing water main EA 4,500
<br /> 2 1,000.00 2,000-
<br /> 12" HDPE storm sewer LF 565
<br /> 12" RCP storm sewer 15.00 8,475 ,r.
<br /> LF 171 25.00 4,275 -
<br /> 15" RCP storm sewer LF 405 30.00 12,150
<br /> 21" RCP storm sewer LF 85 35.00 2,975,--
<br />,
<br /> 21" RCP FES E,q
<br /> 1
<br /> 1 000.00 1406-
<br /> Class
<br /> 1
<br /> III riprap
<br /> CY 8 50.00
<br /> Connect to existing storm MH EA 1 1,000.00 1,0.0
<br /> Storm catch basin w/casting EA 7 1,200.00
<br /> 8,400 -�
<br /> Storm catch basin MH w/casting EA 7 1,500.00 10,500 -
<br /> 6" PVC sanitary sewer LF 180 15.00 2,700•-•
<br /> 8" PVC sanitary sewer LF 550 23,00 12,650 '-
<br />, Improve pipe foundation LF 550 1.00 550 ,r
<br /> 8x6 wye EA
<br /> 1 50.00
<br /> 50 =-
<br /> Sanitary MH w/casting EA 3 1,800.00 5,400 ,.
<br /> Construct MH over existing line EA 1 3,000.00 3,000 '—
<br /> Connect to existing sanitary sewer EA 2 1,000.00
<br /> Remove existing sanitary sewer LF 2,000
<br /> 380 5.00 1,900
<br /> Estimated Construction Cost
<br /> +50% Security Deposit $251,805
<br /> 125,9031-1\11/1"Tota!Security Deposit Required
<br /> $377,708
<br /> ;(-09C .1a o - $
<br /> ti
<br /> 0
<br /> IA.GE ��g ,G
<br /> - -- —
<br />
|